Page 1
• 2 x 12V 7Ah batteries are supplied. The AC adaptor included, is used to maintain charge in the batteries. • Periodic checks of the operator are required to ensure safe operation • Save this manual for future reference GTR099 swing gate opener manual – Revision 22...
Connection of the control board ....................... 18 How to Program the Remote to the Opener ..................20 How to Erase All the Remote Codes ....................20 Setting of the Control Board ......................21 Trouble Shooting ..........................23 GTR099 swing gate opener manual – Revision 22...
14. Do not permit children to play on or around the gate supplied with a separate pedestrian access. and keep all controls out of their reach. For an installation utilizing non-contact sensors (safety sensors), see product manual on the GTR099 swing gate opener manual – Revision 22...
Open End Wrenches — 14mm & 17mm or Adjustable Wrenches Wire Strippers C-Clamps — small, medium, and large Level Hacksaw or Heavy Duty Bolt Cutters Phillips Screwdriver An extra person will be helpful GTR099 swing gate opener manual – Revision 22...
Page 8
Built in max. Motor running time (MRT) for additional safety protection (40 seconds) Reliable electromagnetic limit switches for easy adjustment Can be equipped with a wide range of accessories. GTR099 swing gate opener manual – Revision 22...
If the post is smaller than 6" diameter or square, it should be made of metal and set in cement to ensure its stability. GTR099 swing gate opener manual – Revision 22...
Please Note: Each swing arm contains an internal thread that may separate if over extended. If overextended “Click” may be heard, to re-connect push and screw the sliding arm Clockwise until the arm begins to retract by hand. GTR099 swing gate opener manual – Revision 22...
Page 11
M10 nut on the bottom of the bolt and hand tighten. 2. Attach the gate bracket and post bracket assembly to the opener by inserting a clevis pin. Secure the clevis pins using the hairpin clips. GTR099 swing gate opener manual – Revision 22...
Page 12
Post Bracket Assembly to obtain the minimum clearance and eliminate the binding. When the minimum clearance has been obtained and any binding has been eliminated, place the M8 x 30 bolt through the aligned holes in the Post Bracket and the Post Pivot Bracket. GTR099 swing gate opener manual – Revision 22...
Page 13
It allows slight adjustments to the post bracket. Then remove the post bracket and gate bracket by taking off the C-clamps. GTR099 swing gate opener manual – Revision 22...
Page 14
Gate Bracket. Secure each clevis pin with a hairpin clip. 12. Open the release hole plug on the top of the gate opener, insert the release key, and turn the key 90°counterclockwise. This restores normal operation. GTR099 swing gate opener manual – Revision 22...
Page 15
Please Note: The swing arm contains an internal thread that may separate if over extended. If overextended “Click” may be heard, to re-connect push and screw the sliding arm Clockwise until the arm begins to retract by hand. Push to Open Limit Switch Settings: GTR099 swing gate opener manual – Revision 22...
The length of the wire of the transformer is 1.5m(5’). So if the distance between the outlet and the control box is longer than that, you should use an extended wire to connect the transformer to the control board. The wire size should be at least 16AWG. GTR099 swing gate opener manual – Revision 22...
Page 17
If electrical outlet is located outdoors, outlet and transformer must be protected by a weatherproof cover. All work with mains power must be done by a qualified electrician. GTR099 swing gate opener manual – Revision 22...
Connection of the Control Board: GTR099 swing gate opener manual – Revision 22...
Page 19
Please refer to your accessory manual for correct connection 9. Wired Keypad (optional) Please refer to your accessory manual for correct connection 10. External Receiver (optional) Please refer to your accessory manual for correct connection GTR099 swing gate opener manual – Revision 22...
Press and hold the CODE SW button until the CODE LED goes from ON to OFF. This will take approximately 8 seconds and will remove all remote memory from the gate motor. GTR099 swing gate opener manual – Revision 22...
OFF – Photocell function disabled. You must set the switch #3 to ON to enable the photocell function if you want to use the photocell with the gate opener. Factory default setting is OFF. GTR099 swing gate opener manual – Revision 22...
Page 22
Used to adjust the soft stop period of the gate opener. Turn the potentiometer clockwise to increase the soft stop period. Turn it counter-clockwise to decrease the soft stop period. The auto close time can be adjusted stepless from 1 to 5 seconds. GTR099 swing gate opener manual – Revision 22...
1. Each swing arm contains an internal thread that may separate if over extended. Gate arm is over-extended and won’t If overextended “Click” may be heard, to retract re-connect push and screw the sliding arm Clockwise until the arm begins to retract by hand GTR099 swing gate opener manual – Revision 22...
Page 24
For any technical enquiries, please call Richmond Wheel & Castor Co on 1300 474 246 or fill out the support form located at www.gatesupport.richmondau.com Battery Charging: Important: Care is essential when handling your battery for charging. With incorrect handling and overcharging, shorting can occur.
Need help?
Do you have a question about the GTR099 and is the answer not in the manual?
Questions and answers