Battery Terminal Installation (continued)
Battery Terminal: Service and Repairs
g296708
6. Install the 4 (T-20) torx screws to the motor fan shroud. Torque screws to
15–20 in-lbs. (1.7–2.26 Nm).
g293757
7. Install the power head upper shroud. Secure with 8 (6 top-around the battery
cavity and 2 on the bottom rear) (1/4 x 1.0 inch) flange screws securing
the power head upper shroud to the lower shroud. Torque screws to 30 ±
3 in-lbs. (3.39 Nm).
Figure 105
Figure 106
Page 9–10
60v WPM Service Manual
3429-828 Rev A