Gather the required tools and parts before starting installation.
Read and follow the instructions provided with any tools listed
here.
T ools needed
Phillips screwdriver
■
Scissors
■
Level
■
WARNING
Excessive Weight Hazard
Use two or more people to move and install
air conditioner .
Failure to do so can result in back or other injury .
Tools and Parts
Tape measure
■
Cordless drill and
bit
1 /8"
■
Pencil
■
Unpack the Air Conditioner
Parts supplied
Check that all parts are included in parts package.
A
B
C
D
E
A Adhesive seal
.
(2)
B Foam seal
B Foam seal
.
.
S
C.
ealing sponge
D. lock frame
(for Wooden windows)(2)
Remove packaging materials
Remove and dispose of/recycle packaging materials.
■
Remove tape and glue residue from surfaces before turning
on the air conditioner. Rub a small amount of liquid dish soap
over the adhesive with your fingers. Wipe with warm water
and dry.
Do not use sharp instruments, rubbing alcohol, flammable
■
fluids, or abrasive cleaners to remove tape or glue. These
products can damage the surface of your air conditioner.
Handle the air conditioner gently.
■
■
Remove top rail from the packaging material.
Packaging
4
H
F G
I
K
E .. lock frame
H Side curtains (2)
(for Vinyl-Clad windows)(2)
I Top rail
F. 3
/8"
screws(4)
J. sash lock
G. 3
/4"
screws(7)
K. Air conditioner
J
.
.
Top Rail