Heavy oil burners
Hide thumbs Also See for P200 T/N:

Advertisement

RING SUPPLY LINE
(for heavy oil with viscosity up to 50°E at 50°C)
1 - Tank (heated for heavy oil)
2 - Filter (with resistance for oil > 7°E at 50°C)
3 - Forwarding pump
4 - Control manometer
5 - Shutter valves (in couple) excluding the burner
6 - Burner (provided for Kit for heavy oil code no. 3000721)
7 - Pressure adjuster
8 - Filter (with resistance for oil > 7°E at 50°C)
9 - Burner pump
WARNING
- The oil could easily flow through the pipes if those are properly seized, protected and heated (by electricity, steam
or hot water).
- The forwarding pump capacity should be at the least double of that of the burner pump.
- If several burners are supplied through the same ring supply line, the forwarding pump should have a capacity of
approx. 30% more than the sum of the single burners outputs.
- For starting-up: after excluding the burner by the shutter valves (5) let the oil flow into the supply ring up to reach
the required circulation; after than open the valves and supply normally the burner.
GRAVITY SUPPLY LINE
(only for oil with max. viscosity up to 7°E at 50°C)
Notice: before placing the burner in operation, ensure that the return line is open. Any obstruction may damage the
pump seal.
5832
HEAVY OIL SUPPLY LINE
Pump priming
Loose the tap of the vacuometer plug
(6) (fig. 1) and wait for the oil flow.
H = Difference in the pipes height
L = Total length of the suction tube
5
L meters
H
meters
ø 1"
ø 11/4"
0
2
10
0,5
3
11
1
4
12
1,5
5
13
2
6
14

Advertisement

loading

This manual is also suitable for:

34377853437786467 t80