Download Print this page

Mercia Garden Products 01PTOSBA1006DDFW-V1 General Instructions Manual

10x6 apex, fixed window - 10x6 apex, no window
Hide thumbs Also See for 01PTOSBA1006DDFW-V1:

Advertisement

Quick Links

General Instructions
10X6 APEX, FIXED WINDOW - 10X6 APEX, NO WINDOW
BEFORE YOU START PLEASE READ INSTRUCTIONS CAREFULLY
- Check the pack and make sure you have all the parts listed.
- When you are ready to start, make sure you have the right tools at hand (not supplied) including a Phillips
screwdriver, Stanley knife, wood saw, step ladder and drill with 2mm bit.
- Ensure there is plenty of space and a clean dry area for assembly.
TIMBER
As with all natural materials, timber can be a ected during various weather conditions. For the duration of heavy
or extended periods of rain, swelling of the wood panels may occur. Warping of the wood may also occur during
excessive dry spells due to an interior moisture loss. Unfortunately, these processes cannot be avoided but can be
helped. It is suggested that the outdoor building is sprayed with water during extended periods of warm
sunshine and sheltered as much as possible during rain or snow.
Once your garden building has been installed it will need to be treated as soon as possible and annually to
prevent the timber from deteriorating and to waterproof it. This is required to maintain the anti-rot guarantee.
Dip Treated buildings - Require a preservative treatment to protect against rot and decay and a waterproof treat-
ment to prevent water ingress
Pressure Treated buildings - Require a waterproof treatment to prevent water ingress
Log Cabins - Are supplied untreated and require a preservative and waterproo ng treatment.
BUILDING A BASE
When thinking about where the building and base is going to be constructed:
Ensure that there will be access to all sides for maintenance work and annual
treatment.
Ensure the base is level and is built on rm ground, to prevent distortion. Refer to diagrams for the base
dimensions, The base should be slightly smaller than the external measurement of the building, i.e. The cladding
should overlap the base, creating a run o for water. It is also recommended that the oor be at least 25mm above
the surrounding ground level to avoid ooding.
TYPES OF BASE
- Concrete 75mm laid on top of 75mm hard-core.
- Slabs laid on 50mm of sharp sand.
Whilst all products manufactured are made to the highest standards of Safety and in the case of childrens
products independently tested to EN71 level, we cannot accept responsibility for your safety whilst erecting or
using this product.
Refer to the instructions pages for you speci c product code
Please retain product label and instructions for future reference
x2
All building's should be
erected by two adults
For ease of assembly, you
MUST pilot drill all screw
holes and ensure all screw
heads are countersunk.
2mm Drill bit
Pressure Treated Timber
Pressure treating is a chemical process which helps to protect wood against adverse weather which could
lead to rot or insect damage.
The most common chemicals used to pressure treat wood are Alkaline Copper Quaternary (ACQ),
Copper Azole (CA), and Micronized Copper Quaternary (MCQ).
Safety: Always wear gloves, eye protection and a dust mask when handling wood. Due to chemicals in
pressure treated wood, never burn its sawdust or scraps; instead dispose in a land ll.
For assistance please contact customer care on: 01636 880514
Mercia Garden Products Limited,
Sutton On Trent,
Newark,
Nottinghamshire,
NG23 6QN
www.merciagardenproducts.co.uk
Winter = High Moisture = Expansion
Summer = Low Moisture = Contraction
CAUTION
Every e ort has been made during the
manufacturing process to eliminate the
prospect of splinters on rough surfaces of the
timber. You are strongly advised to wear gloves
when working with or handling rough sawn
timber.

Advertisement

loading
Need help?

Need help?

Do you have a question about the 01PTOSBA1006DDFW-V1 and is the answer not in the manual?

Questions and answers

Summary of Contents for Mercia Garden Products 01PTOSBA1006DDFW-V1

  • Page 1 - Concrete 75mm laid on top of 75mm hard-core. - Slabs laid on 50mm of sharp sand. Mercia Garden Products Limited, Sutton On Trent, Whilst all products manufactured are made to the highest standards of Safety and in the case of childrens...
  • Page 2: Pre-Assembly

    01PTOSBA1006DDFW-V1 & 01PTOSBA1006DDFW-V1-NW Please retain product label and instructions for future reference Overall Dimensions: Length = 3028mm Nail Bag Width = 2484mm 40mm Screw x 116 Felt Tacks x 120 Height = 2121mm 01PTOSBA1006DDFW-V1 30mm Screw x 76 50mm Screw x 28...
  • Page 3 Step 1 Step 3 Fix the corners with 50mm Place oor on rm and level base, ensure screws as shown in diagram. base has suitable drainage free from areas where water can collect. (See front page on 12x50mm Screws base requirements). 50mm Attach the oors using 12 x 40mm screws screw...
  • Page 4 Step 7 Step 5 ENSURE SUPPORT BARS ARE MANUALLY SUP- Fix a Truss support i)Position a truss frame to the PORTED UNTIL FIXED AT between the two truss ridge bar sloping down towards BOTH ENDS frames and x in place the building side, ensure it is using 40mm screws, central to the middle upright of...
  • Page 5 Step 9 Step 11 Fix the eaves frame to Cut out three strips of the roof sheet using 3104mm felt and place 3x30mm screws for each onto the roof. sheet. 8x30mm Screws Place the felt at onto the Place two roof sheets roof in the order that is ontop of the plain gable stated on the diagram...
  • Page 6 Step 13 Step 12 Fit the cover trims to the building and secure in place with 40mm screws as shown. Pre drill to avoid splitting. 18x40mm Screws 40mm Pre drill screw hole Step 14 Attatch faisca’s to the roof leaving a slight overhang at the top.
  • Page 7 Step 16 Step 15 For the no window version go to step 11 Fix the door strips to the master door using 5x30mm 30mm screws. Fix the window strips to the two screw Pre drill 30mm If the strips are attatched to hole screw pieces of framing that sit...
  • Page 8: After Treatment

    It is ESSENTIAL that you apply wood treatment immediately after the building has been assembled. AFTER TREATMENT: score around protective cover on glazing and carefuly peel covering back P 15...

This manual is also suitable for:

01ptosba1006ddfw-v1-nw