Introduction
The TPD4S214 is a single-chip protection solution for USB On-the-Go and other current limited USB
applications. This device includes an integrated low R
current supply to peripheral devices. TPD4S214 offers low capacitance TVS ESD clamps for the D+, D–,
and ID pins for both USB2.0 and USB3.0 applications. The VBUS pin can handle continuous voltage
ranging from –2V to 30V. The over voltage lock-out (OVLO) at the VBUS pin ensures that if there is a fault
condition at the VBUS line, the TPD4S214 is able to isolate it and protects the system from damage.
Similarly, the under voltage lock out (UVLO) at the VOTG_IN pin ensures that there is no power drain
from the internal OTG supply to external VBUS if VOTG_IN drops below safe operating level.
When EN is high, the OTG switch is activated and the FLT pin indicates whether there is a fault condition.
The soft start feature waits 16 ms to turn on the OTG switch after all operating conditions are met. The
FLT pin asserts low during any one of the following fault conditions: OVLO (V
temperature, over current, short circuit condition, or reverse-current-condition (V
switch is turned off during any fault condition; in addition, it is also turned off during UVLO condition
(V
< V
). Once the switch is turned off, the IC periodically rechecks the faults and UVLO internally.
OTG_IN
UVLO
If the IC returns to normal operating conditions, the switch turns back on and FLT is reset to high.
There is also a VBUS detection feature for facilitating USB communication between USB host and
peripheral device. Refer to Table 2 in data sheet for detection scheme. If this is not used, DET pin can be
either floating or connected to ground.
SLVU839 – February 2013
Submit Documentation Feedback
DS(ON)
Copyright © 2013, Texas Instruments Incorporated
SLVU839 – February 2013
TPD4S214EVM
N-channel current limited switch for OTG
> V
BUS
OVLO
> V
BUS
User's Guide
), over
). The OTG
OTG_IN
1
TPD4S214EVM

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the TPD4S214EVM and is the answer not in the manual?

Questions and answers

Summary of Contents for Texas Instruments TPD4S214EVM

  • Page 1 Refer to Table 2 in data sheet for detection scheme. If this is not used, DET pin can be either floating or connected to ground. SLVU839 – February 2013 TPD4S214EVM Submit Documentation Feedback Copyright © 2013, Texas Instruments Incorporated...
  • Page 2: Highlighted Features

    Space Saving WCSP (12-YFF) Package EVM Description The TPD4S214EVM provides full functionality of TPD4S214. Dependent on the jumper configurations, VOTG_IN can be supplied through either the USB Type-A connector labeled USB_IN or the banana jack labeled VOTG_IN. VBUS can be output to either the Micro USB-B connector labeled USB_OUT or a two pin terminal block labeled VBUS_OUT.
  • Page 3 VBUS_OUT Terminal block USB_OUT connector Table 3. Jumper Configurations VBUS current limiter adjust 110K 110K 110K 110K ADJ_SELECT ~ 1A ~ 0.5A ~ 1.5A User supplied SLVU839 – February 2013 TPD4S214EVM Submit Documentation Feedback Copyright © 2013, Texas Instruments Incorporated...
  • Page 4: Bill Of Materials

    Resistor, Metal Film, 1/4 watt, ±5% 1206 Resistor, Metal Film, 1/4 watt, ±5% TP1-4 0.100 inch dia. 5002 Test Point, White, Thru Hole Color Keyed 5002K-ND Keystone TPD4S214EVM SLVU839 – February 2013 Submit Documentation Feedback Copyright © 2013, Texas Instruments Incorporated...
  • Page 5 Schematic www.ti.com Schematic Figure 1. Schematic Drawing SLVU839 – February 2013 TPD4S214EVM Submit Documentation Feedback Copyright © 2013, Texas Instruments Incorporated...
  • Page 6: Important Notice

    IMPORTANT NOTICE Texas Instruments Incorporated and its subsidiaries (TI) reserve the right to make corrections, enhancements, improvements and other changes to its semiconductor products and services per JESD46, latest issue, and to discontinue any product or service per JESD48, latest issue.
  • Page 7: Texas Instruments

    Mouser Electronics Authorized Distributor Click to View Pricing, Inventory, Delivery & Lifecycle Information: Texas Instruments TPD4S214EVM...

Table of Contents