REASSEMBLY OF CARRIER SUB
1.
Washing of carrier
Put in a steam washer the carrier whose burr is removed
completely with corner face-milling and place it on the
assembly die after checking if there is not left any foreign
substance in it.
2.
Washing of planetary gear
Check if planetary gear parts are washed or dented, and
put them on the assembly die.
3.
Reassembly of carrier #1 assembly
A.
Place the carrier #1 assembly on the assembly jig,
insert the thrust washer in it, and fix it to the hole of
carrier.
B.
Put a pressure jig on the pin and use a press to insert
it.
Swing Reduction Gear
Figure 8
Figure 9
Figure 10
SP000921
Page 13