Kohler K-1167 Installation Manual page 9

Bath with airjets
Hide thumbs Also See for K-1167:
Table of Contents

Advertisement

Available languages

Available languages

Secure the Unit (cont.)
Apply a generous amount of high-quality construction adhesive to the bottom of the leveling blocks.
With help, carefully move the bath into the installation area.
Verify the leveling blocks are resting directly on the subfloor. Reposition or shim as needed.
Verify the bath is level across the top of the bath. If the bath is not level, shims must be used under
the bath.
Connect the drain tailpiece to the trap.
Remove the protective tape from the rim.
Kohler Co.
9
1167629-2-A

Advertisement

Table of Contents
loading

Table of Contents