ABB REL300 Instruction Manual page 166

Hide thumbs Also See for REL300:
Table of Contents

Advertisement

I.L. 40-385.7
1.2
Pilot Maintenance Test
Connect the REL300 per Figure B-1, Configuration 1.
1.2.1
Basic Function Test
Step 1.
1.2.2
Input Opto-Coupler Check
The following test steps 2 and 3 are optional since the OPTO inputs PLT-ENA, RCVR-1 and
RCVR-2 have been checked in Section 1.1.4 (page B-11).
Step 2.
a. Block Systems Only
Change the STYP setting to BLK. Apply a forward fault, as shown in the Non-Pilot Main-
tenance Test, step 5. The relay should not trip.
Apply a rated dc voltage to PLT ENA terminals TB 5/9(+) and TB 5/10(-). Repeat the test.
The relay should trip.
b. POTT/PUTT Systems Only
Change the STYP setting to POTT. Change the LED mode to TEST and select the func-
tion "RS1". Push the ENTER button; the LED should be "ON". Apply a forward fault as
shown in
relay should not trip. Apply a rated dc voltage to terminals TB 5/9(+) and TB 5/10(-). Re-
peat the test. The relay should trip.
Step 3.
a. Block Systems Only
Change the STYP setting to BLK. Apply a forward fault as shown in the Non-Pilot Mainte-
nance test, Step 5 (page B-1). The relay should trip.
B-4
Repeat Step 1 thru 8 in the Non-Pilot Maintenance Test, page B-1 (1.1.1 thru
1.1.5).
PLT ENA Terminals
Change the following settings from Table B-1 (page B-11):
• PLT
YES
• Z1P
0UT
• Z1G
OUT
• PLTP
OUT
• PLTG
6.0
• Z3P
OUT
• Z3G
6.0
• T3P
BLK
• T3G
BLK
• Z3FR1
REV
Non-Pilot Maintenance test, Step 5. With the ENTER button depressed, the
Receivers 1 and 2
Apply a dc voltage to PLT ENA terminals TB 5/9(+) and TB5/10(-).

Advertisement

Table of Contents
loading

Table of Contents