Key for
2
1
Readout level
1.1
Cumulated cold energy since
commissioning
1.2
Cumulated heat energy since commis-
sioning
1.3
Display test "everything on"
1.4
Display test "everything off"
1.5
Due date value cold energy
1.6
Due date* cold energy
1.7
Due date value heat energy
1.8
Due date heat energy
* The production date is displayed here before the first due date.
LT = long button press
KT = short button press
...S = display duration
2
Service level
2.1
Current flow rate
2.2
Inlet temperature
2.3
Outlet temperature
2.4
Temperature difference
2.5
Current performance
2.6
Cumulated cold energy volume since
commissioning
2.7
Cumulated heat energy volume since
commissioning
2.8
Next due date cold energy
2.9
Next due date heat energy
2.10
Device number
9
Need help?
Do you have a question about the Compact IV c and is the answer not in the manual?
Questions and answers