To Install The Condensate Trap; Condensate Pipe Work; Internal Connections - Daikin EHYKOMB33AA Installation And Operation Manual

Hide thumbs Also See for EHYKOMB33AA:
Table of Contents

Advertisement

7 Make sure the gas boiler is fixed properly and well aligned with
the indoor unit.
7.2.2

To install the condensate trap

INFORMATION
The boiler is provided with a Ø25 mm flexible pipe on the
condensate trap.
Prerequisite: The boiler MUST be opened before installing the
condensate trap.
1 Fit the flexible tube (accessory) to the condensate trap outlet.
2 Fill the condensate trap with water.
3 Slide the condensate trap as far as possible upwards onto the
condensate drain connector below the gas boiler.
4 Connect the flexible tube (where applicable with the overflow
pipe from the pressure relief valve) to the drain via an open
connection.
EHYKOMB33A
Daikin Altherma hybrid heat pump – gas boiler module
4P353067-1K – 2020.10
WARNING
▪ ALWAYS fill the condensate trap with water and place
it on the boiler before powering up the boiler. See
illustration below.
▪ NOT placing or filling up the condensate trap may
cause flue gases to come into the installation room and
can lead to dangerous situations!
▪ In order to place the condensate trap, the front cover
MUST be pulled forward or removed entirely.
NOTICE
It is recommended that any external condensate pipe is
insulated and increased to Ø32 mm in order to prevent the
condensate from freezing.
7.3

Condensate pipe work

INFORMATION
The condensate discharge system MUST be made of
plastic, no other materials may be used. The discharge
duct MUST have a minimum gradient of 5~20  mm/m.
Condensate discharge via the gutter is NOT allowed due to
risk of frost and the possible damage to the materials.
7.3.1

Internal connections

If possible, the condensate drain pipe should be routed and
terminated so that the condensate drains away from the boiler under
gravity to a suitable internal foul water discharge point such as an
internal soil and vent stack. A suitable permanent connection to the
foul waste pipe should be used.
7 Installation
Installation and operation manual
13

Advertisement

Table of Contents
loading

Table of Contents