Maintenance Procedures - GE Power Break II Installation Instructions Manual

Draw-out bod-4000 ampere frames
Hide thumbs Also See for Power Break II:

Advertisement

10
Figure
Rotating the breaker forward for inspection.

Maintenance Procedures

A regular maintenance schedule should be established
to obtain
the
best
service
operating and local conditions dictate the frequency of
inspections required.
A permanent record should be kept of all maintenance
work.
It will be a valuable reference for subsequent
maintenance
work
and
should include reports of tests performed, condition of
equipment, and repairs and adjustments.
Maintenance
employees must follow all recognized
safety
practices,
such
National Electrical Safety Code and in
other safety regulations. Solid insulation surrounding
an energized conductor in power apparatus must never
be relied upon to provide protection to personnel.
Draw-out structure and connections should be given
the following overall maintenance
Maintenance
frequency depends on the severity
service and atmospheric conditions. Equipment subject
to highly
repetitive
operation
frequent maintenance.
While
some of these
breaker in the tilt-out position, a complete check can
only be made after removing the breaker from the
rails.
WARNING:
Before attempting any work on draw-out
devices, ensure that all sources of power-primary
and secondary-have been de-energized.
and
reliability.
station
operation.
Records
as
those
contained
in
company or
at least annually.
may
require
steps can be done with
Power Break® II Circuit Breakers
A VERTISSEMENT:
intervention sur des appareils debrochable, verifier
que toutes les alimentations de puissance,
primaire et secondaire, sont coupees.
1.
Thoroughly clean the equipment by removing all
dust and other accumulations. Wipe
clean
the
compressed air for blowing out equipment.
2.
Inspect buses and/ or terminal lug connections for
signs of overheating or weakening of insulating
supports.
mechanical
functioning.
parts with a suitable lubricant, such as Mobil 28
red grease.
3.
Check
primary
surfaces for signs
heating. If required, clean contacts with a suitable
solvent. Discoloration of silvered surfaces is not
Plant
harmful
unless
deposits, such as sulfides, on the contact surfaces.
4.
Check to see that all anchor bolts and structure
bolts are tight. Inspect all cable or bus connections
for signs
of overheating and tighten
connections. Check that all secondary connections
are secure and all control wiring is intact.
5.
Mter
cleaning
measure and record resistances to ground and
between
phases
the
connections. Since definite limits cannot be given
for satisfactory resistance values, keep a record of
resistance
insulation from one maintenance period to the
next can be recognized by comparing readings.
Readings
conditions each time, if possible, and the record
of
should include temperature and humidity.
High potential tests are not required,
more
seems advisable, based on insulation resistance
tests or after repairs, test voltage should not exceed
the
75%
of the factory test voltage, which is two times
the rating plus 1000 volts.
6.
Operate each breaker in the
ensure proper functioning.
important for breakers that normally remain i n
either
the opened or closed positions for long
periods.
7.
When
the
conditions,
excessive moisture, schedule maintenance at more
5
Draw-Out Breaker Installation
Avant
de
commencer
buses
and
supports.
Check
indicating
and
key
interlocks
Lubricate all moving and rubbing
and
secondary
of abnormal
wear
atmospheric
conditions
with
the
breaker
of insulation
on
readings
so
that
weakening
should
be
taken
under
TEST
This is
equipment
is
subject
such as contaminating
toute
a
la fois
or vacuum
Do
not
use
devices
and
for
proper
disconnecting
or
over­
cause
all loose
removed,
buses
and
of
similar
but if it
position
to
particularly
to
unusual
fumes
and

Hide quick links:

Advertisement

loading