Draw-Out Breaker Installation
.1.
Racking Tool
7
Figure

Wrench attached to the breaker racking shaft.

8.
Figure

Compartment position indicator on the front of the breaker.

Removing the Breaker

Use the following procedure to remove the draw-out
breaker from the substructure.
CAUTION:
connected and removed.
ATTENTION:
OFF
1.
2.
Substructure
3.
Rejection
Feature
4.
.06in
minimum
Breaker
Rejection
Feature
Compartment
Position Indicator
4
The breaker must be
Le disjoncteur
avant qu'il ne soit debroche et depose.
Engage the
1
!2
-inch square end of the ra cking
shaft with the supplied wrench, catalog number
TDORT, as illustrated in Figure
shaft counter-clockwise to withdraw the breaker to
TEST
DISCONNECTED
the
or
compartment
position
Figure 8.
Pull the substructure rails out as far as possible
until they drop into the horizontal locked posi­
tion, as illustrated in Figure
DISCONNECTED
From
the
breaker out on the rails until the front rollers fall
into the detent, as illustrated in Figure
The breaker can now be rotated about the front
roller by pulling forward, as illustrated in Figure
10, for inspection of the rear of the breaker, or it
can be completely removed
Lifting Bar, as illustrated in Figures
9.
Figure

Withdrawing the substructure rails.

OFF
before it is dis­
doit etre en position
7,
and rotate the
position.
The
indicator
is
shown
i n
9.
position,
pull
the
6.
after attaching
the
4
5.
and

Hide quick links:

Advertisement

loading