Preliminary operations

PREPARATIONS AND CHOICE
1
OF POSITION
The pre-installation sheet supplied at the time
of purchase provides all the information
necessary for a correct preparation of the
installation environments.
Before installing the minipool, check that everything
has been prepared. Find below a quick checklist, for
complete information always refer to the pre-installation
sheet.
Check that:
• A platform or a recess (in the case of recessed
installations) of reinforced concrete, with a minimum
thickness of 10 cm, has been created, perfectly flat and
suitable for supporting the weight of the minipool and
the people within.
• Ø15 cm vents have been installed to ensure proper
ventilation of the technical compartment
• Drainage grating around the perimeter has been
installed to help preserve the equipment and the
structure (even for indoor installations).
• Non-slip flooring has been installed in the area around
the minipool.
• For a recessed installation, a technical inspection port
measuring at least 50 cm wide has been prepared on
all sides of the minipool.
• The connections to the electrical grid have been made
in compliance with current regulations in force in the
country of installation.
• A water softener has been installed for the water used
to fill the minipool if the water has a high degree of
hardness.
• For outdoor recessed versions, the walls have been
insulated to protect against the cold.
2

CHECKING MINIPOOL INTEGRITY

After having removed the minipool from the packing, check its integrity.
Check:
• That there is no visible structural damage.
• That there are no cracks in the surface of the minipool or in the outer covering (cracks due to incorrect transport
or support are not covered by the warranty).
• The correct position of the sleeves and pipes.
• That any ties are not loosened.
If you notice any anomalies, do not proceed with the installation but rather promptly contact the Manufacturer.
Muse - Maya - Wave
EN
More information

OUTDOOR INSTALLATION

Preparations:
To run the electric cables from the main electrical panel
to the minipool underground ducts must be used
and adequately protected against freezing by using
insulation. It is also recommended to add drainage
points in them to prevent standing water.
Choice of
position: take into account the proximity
of trees or hedges, and note that debris (e.g., leaves)
can cause damage to the equipment over time that is
not covered by warranty and make maintenance more
expensive and frequent. It is also recommended to
always install flooring around the minipool, possibly
anti-slip.

INDOOR INSTALLATION

Preparations: in the area used to access the minipool
it is recommended to install anti-slip flooring. The
evaporation of water in the minipool in the presence
of high internal temperatures can generate very high
levels of humidity in the environment.
To avoid this problem, provide good natural or forced
ventilation in the installation environment and, if
necessary, a dehumidification system. Damage caused
by this phenomenon is not covered by the manufacturer
warranty.
Choice of
position: Always take into account the size
of the minipool: narrow passages, doors and steps can
be an obstacle to its transport to the desired place.
5
minipool

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Muse and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

This manual is also suitable for:

MayaWave

Table of Contents