Download Print this page

Eastwood 20555 Instructions page 3

1", 1.5", 2", 2.5" punch & bead die set

Advertisement

INCLUDES
(1) Bolt
(2) Washers
OPERATION
PUNCH & BEAD
• Determine the position and
direction of the fi nished hole
and bead.
• Drill a ½" hole at the center of
the location.
• Firmly secure the work-piece.
• Lubricate washers.
• Assemble the tool in the order
shown (FIG A) & (FIG B).
• From left to right, stack two
washers, Male Bead Die, and
Inner Cutting Die onto the
Bolt. Insert the end of the Bolt
through the hole drilled in the
work-piece. On the opposite
side of the work-piece, thread
on the Female Bead Die,
with the mating cavity facing
the Male Bead Die and Inner
Cutting Die.
• Tighten the Bolt by hand until
resistance is felt.
• Using a wrench or socket,
continue to turn the Bolt until
the material is pierced and
the feature is formed.
• Disassemble tool in
reverse order.
To order parts and supplies: 800.345.1178 >> eastwood.com
(1) Male Bead Die
FIG. A
2 Washers
Bolt
Bolt
Bolt
FIG. B
FIG. B
FIG. B
Finished Result
(1) Inner Cutting Die
Male
Bead Die
(1) Female Bead Die
Work Piece
Inner
Female
Cutting Die
Bead Die
3

Advertisement

loading

This manual is also suitable for:

20533203562053420535