TB-5V-LX110/220/330-DDR2Hardware User Guide Rev2.1s
3) If FPGA configuration is completed, LED2 (Green) will light.
Configuration completed.
Figure.61 DONE LED
4) If Reconfiguration bottom (SW2) is pushed, start a reconfiguration of FPGA.
Figure.62 Reconfiguration Bottom
4, 2007 (Rev 2.1s)
25/26
Sep