Page 1
Last Modified: 17/05/2021 INSTALLATION MANUAL 1050|1150 Premium Series 30 Day Technical Support: Call 01908 317512 and request technical support for aiding your installation. Replacements Parts: Inside of your warranty period visit: https://www.insigniashowers.com, click support and make a warranty claim.
www.insigniashowers.com Last Modified: 17/05/2021 Contents Installation Assistance Installing the Door Handles, Seals and Magnets Thank you for your purchase Installing the Roof Tips for assembly Installing the Fixed Glass Panel Braided Hose QR Code/Link Installing the Seals Electrical/Pressure/Tool requirements Installing the Accessories Box contents Installing the Door Wheels Installing the Waste and Levelling the Tray...
Simply click the link below and watch the installation process. Shower Install Please note: this build video is for an Insignia Platinum Shower, however 90% of the process is the same for assembly so it should help you on your way!
Page 4
Last Modified: 17/05/2021 Thank you for your recent purchase of an Insignia shower. Please read this booklet with great care to ensure you get the best out of your build and have a shower that will last for many years to come! Like everything, in order to obtain a first class product that will serve you well for many years, the effort and correctness put into the assembly will reflect in the quality of your finish.
TIP 4—Sealing When using Insignia’s RubberGum, please ensure the product does not come in contact with your silicone as this will cause the RubberGum to fail and will not adhere as intended. Rubbergum is immediately waterproof and will gain additional strength over time.
www.insigniashowers.com Last Modified: 17/05/2021...
Page 7
www.insigniashowers.com Last Modified: 17/05/2021 Electrical Requirements Pressure/Water Requirements Tools Required STEAM VERSION We recommend a BAR pressure between 2.5 and 3.4 BAR. If You will require: you have a combi boiler system no problem should be Voltage Rating 220-240AC • •...
ST16 16mm x 3.5mm Screws VERY IMPORTANT ST16 16mm x 4mm Screws Have you got everything? If not please contact the Insignia directly on 01908 317 512. ST20 or WN20 20mm Nut and Bolt or Wing Nut Remember NEVER book your tradesman until everything has arrived, been checked and is present.
Page 9
www.insigniashowers.com Last Modified: 17/05/2021 Step 1 — Level the Tray and connecting the waste Twist to adjust NOTE: FOR STEAM SHOWERS ONLY: Check the Spigot is drilled out prior to fitting. If it isn’t ensure you drill it out!
www.insigniashowers.com Last Modified: 17/05/2021 Step 2 — Connecting the framework Framework securing clips x4 Internal View Wider rail on top Narrow rail at the bottom...
www.insigniashowers.com Last Modified: 17/05/2021 Step 3 — RubberGum the tray Apply RubberGum to raised sections of the tray and remove backing paper.
Page 12
www.insigniashowers.com Last Modified: 17/05/2021 Step 4 — Connecting the left back panel to left side panel ST10 x6 PRESS PANELS DOWN FIRMLY ON TO THE RUBBERGUM. DO NOT SCREW BACK PANELS TO THE TRAY.
Page 13
www.insigniashowers.com Last Modified: 17/05/2021 Step 5 — Connecting the left corner upright to the side panel Internal View...
Page 14
www.insigniashowers.com Last Modified: 17/05/2021 Step 5 — Connecting the left corner upright to the side panel continued ST16 3.5 x3 DB 9...
Page 15
www.insigniashowers.com Last Modified: 17/05/2021 Step 6 — Connecting the framework into the upright. ST16 4 x3 DB 9...
Page 16
www.insigniashowers.com Last Modified: 17/05/2021 Step 7 — Column Connection ST20 x 12 SW9 x 12 WN20 x 12 Rear View (attach nuts and bolts or wing nuts from rear) Below diagram shows the nut/bolt install ———————— ————————...
Page 17
www.insigniashowers.com Last Modified: 17/05/2021 Step 8 — Corner post to framework connection...
Page 18
www.insigniashowers.com Last Modified: 17/05/2021 Step 8 — Corner post to framework connection continued ST16 4 x3 DB 9...
Page 19
www.insigniashowers.com Last Modified: 17/05/2021 Step 9 — Connecting the right side panel...
Page 20
www.insigniashowers.com Last Modified: 17/05/2021 Step 9 — Connecting the right side panel continued ST16 3.5 x3 DB 9...
Page 21
www.insigniashowers.com Last Modified: 17/05/2021 Step 10 — Connecting the right back panel ST10 x6 ST20 x 12 SW9 x 12 WN20 x 12...
Page 22
www.insigniashowers.com Last Modified: 17/05/2021 Step 11 — Fitting door handle, seals and magnets Slide magnetic seal into channel Ensure the flat side of the magnet faces out, towards the door. Once in position trim down so the roof sits flush.
Page 23
www.insigniashowers.com Last Modified: 17/05/2021 Step 12 — Connecting the roof ST8 x4...
Page 24
www.insigniashowers.com Last Modified: 17/05/2021 Step 13 — Fixed Glass Connection ST16 3.5 x2 DB 9...
Page 25
www.insigniashowers.com Last Modified: 17/05/2021 Step 14— Fitting the seals Fit the seals inside the shower 12mm Seal 12mm 7mm Seal...
Page 26
www.insigniashowers.com Last Modified: 17/05/2021 Step 15 — Accessories Installation Slide cover off Slide cover off...
Page 27
www.insigniashowers.com Last Modified: 17/05/2021 Step 16 — Fit top door wheels x 2 Tighten to secure wheels into door runners. DO NOT OVERTIGHTEN Slide cover off Door Step 17— Fit bottom door wheels x 2 Slide cover off Door Step 18 — Fitting the doors Slide covers on...
Page 28
www.insigniashowers.com Last Modified: 17/05/2021 Step 19 — Valve/Water Connections Monsoon Head Jets Hand Shower 2 x Washers located on the back of the valve Cold Water Inlet Hot Water Inlet Outlet for Steam version only...
Page 29
www.insigniashowers.com Last Modified: 17/05/2021 Step 20 — Touch Control Panel Connections Steam Version Shower Cabin Version Roof Light Power Supply Speaker Antenna Speaker...
Water Inlet: When installing the water line for the steam generator, there are 2 options available: • Purchase Insignia’s WRAS approved braided hoses—different packs are available for different shower types. • Install a static water line from the shower valve (middle feed) to the steam generator. Even with a static water line, flexible hosing will still be required for the hot and cold water feeds.
Page 31
www.insigniashowers.com Last Modified: 17/05/2021 Steam Generator Connections (steam version only) Drain: A— Ensure this is facing the steam generator and is tightened fully, then take the hose connected to the steam drain and trim to a desired length. (Image Once trimmed, connect the hose to (A) (Image 2) and secure in place with a jubilee clip from the screw pack contents.
3. Do not aim the hand shower directly at the joints of your shower as this does not fall under “normal showering conditions”. However, due to Insignia’s unique design of the shower tray, water will only leak back in to the tray so you won’t get flooded.
Press once to turn on the panel. Simply press again to turn it off. When powering down the 03 will automatically start and last for approximately 10 minutes. After this the screen will power off. To see our tutorial videos for operating Insignia control panel’s, please search for “Insignia Showers” on YouTube and find our “Insignia Control Panel”...
Page 34
When the Bluetooth is activated this will skip to the next song in your playlist. To see our tutorial videos for operating Insignia control panel’s, please search for “Insignia Showers” on YouTube and find our “Insignia Control Panel” Playlist, or you can...
Page 35
www.insigniashowers.com Last Modified: 17/05/2021 Control Panel Instructions Connecting to Bluetooth Step 2 Step 1 Then simply go on your device and pair To connect a device via up with the shower which should be Bluetooth, press the music shown as “INS”. Once this is complete function button twice (which you will hear a beep to signify you’re looks like a musical note) the...
Page 36
Last Modified: 17/05/2021 Parts List Part Code Part Description SP337 Insignia Control Panel (non SP300 Waste hose -steam version only) SP010 Monsoon Shower head SP301 White insulated pipe (steam version only) SP078 Ozone Module (steam version only) SP117 Insignia Control Panel...
Page 37
www.insigniashowers.com Last Modified: 17/05/2021 Steam Room & Shower Safety Guide Never leave children unattended in the shower or bath. Never bath children (under 12) using whirlpool function if fitted. Regulate the temperature of water before showering. Never allow children to use the steam function. This function is for ADULTS ONLY. Always be aware of the steam outlet position.
Page 38
www.insigniashowers.com Last Modified: 17/05/2021 Steam Room Usage Guide To use the steam room, turn the control panel on. (1) Press the steam button (2) and your generator will be fed with water and the heating element will begin to heat the water to create steam. (You should be seeing steam from your outlet in approximately 60-90 seconds) To set the temperature you want the cabin to reach, press the function button (3) once the steam is active.
Page 39
www.insigniashowers.com Last Modified: 17/05/2021 Bathroom Electrical Zones...
Page 40
www.insigniashowers.com Last Modified: 17/05/2021 There are 3 bathroom electrical zones that have been distinguished in the IEE wiring guidelines and these are: Zone 0 is the area inside a bath, basin or shower. It's characterised as 'any area within a bathroom that can hold water'. Any fitting or electrical appliance utilised inside zone 0 must be a maximum of 12 volts (SELV) and completely secured against both partial and total submersion in water (minimum of IPX7) Zone 1 is the region straight above zone 0 to the height of 2.25m from the base of the bath or shower.
Page 41
(EEE) have to fulfil certain obligations. Under the WEEE directive Insignia is considered the producer of certain products we supply and in line with the demands of the legislation we are pleased to offer the op- portunity to return these products to us for treatment and recycling.
Page 42
www.insigniashowers.com Last Modified: 17/05/2021...
Need help?
Do you have a question about the Premium Series and is the answer not in the manual?
Questions and answers