NEOLIUM LINE 200-250-300-400-600
100-00035565 ind.C - 09/2020

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the NEOLIUM LINE 200 and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for TUBESCA-COMABI NEOLIUM LINE 200

  • Page 1 NEOLIUM LINE 200-250-300-400-600 100-00035565 ind.C - 09/2020...
  • Page 2 NEOLIUM LINE 200-250-300-400-600 FRANCAIS 100-00035566 ind.C - 09/2020...
  • Page 3 NEOLIUM LINE 200-250-300-400-600 Manuel de montage et d'utilisation échafaudage roulant Ce manuel doit impérativement être remis aux utilisateurs Manuel d’instruction EN 1298-IM-fr PV d’essais CEBTP N° BMA6-H-0135 100-00035565 ind.C - 09/2020 Page 1 sur 41...
  • Page 4: Table Of Contents

    1-5. Précautions de montage et d'utilisation ............................. 12 Chapitre 2: Le montage de la version simple et double largeur ..................... 13 2-1. Montage du NEOLIUM LINE 200/250 et 300 2m ........................13 2-1-1. Montage des roues .................................. 13 2-1-2. Montage des lisses ................................... 13 2-1-3.
  • Page 5: Chapitre 1: Les Caractéristiques Techniques De L'échafaudage

    NEOLIUM LINE 200-250-300-400-600 Chapitre 1: Les caractéristiques techniques de l’échafaudage 1-1. Marquage EN 1004 3 8M / 12M XXXD Hauteur maximale Hauteur maximale Référence à la Classe de Accès par escalier : non la charge pour usage intérieur pour usage extérieur Accès par escalier à...
  • Page 6: Nomenclature Des Différents Modèles

    NEOLIUM LINE 200-250-300-400-600 1-3. Nomenclature des différents modèles 1-3-1. Version simple largeur : 200/250 et 300 100-00035565 ind.C - 09/2020 Page 4 sur 41...
  • Page 7: Version Double Largeur : 400 Et 600

    NEOLIUM LINE 200-250-300-400-600 1-3-2. Version double largeur : 400 et 600 100-00035565 ind.C - 09/2020 Page 5 sur 41...
  • Page 8: Schémas De Composition Des Modèles (Par Taille)

    NEOLIUM LINE 200-250-300-400-600 1-4. Schémas de composition des modèles (par taille) Echelle de base simple ou double Rallonge 1m00 simple ou double Rallonge 2m00 simple ou double 1 plateau avec trappe + 1 plateau sans trappe (version LINE 400 et 600)
  • Page 9 NEOLIUM LINE 200-250-300-400-600 NEOLIUM LINE 200/250/300/400 et 600 2m 2m00 /2m50 / 3m00 Numéro d’échelon 3.13 m NEOLIUM LINE 200/250/300/400 et 600 4m Numéro d’échelon 5.13m 100-00035565 ind.C - 09/2020 Page 7 sur 41...
  • Page 10 NEOLIUM LINE 200-250-300-400-600 NEOLIUM LINE 200/250/300/400 et 600 6m Numéro d’échelon 7.13m 100-00035565 ind.C - 09/2020 Page 8 sur 41...
  • Page 11 NEOLIUM LINE 200-250-300-400-600 NEOLIUM LINE 200/250/300/400 et 600 8m Numéro d’échelon 9.13m 100-00035565 ind.C - 09/2020 Page 9 sur 41...
  • Page 12 NEOLIUM LINE 200-250-300-400-600 NEOLIUM LINE 200/250/300/400 et 600 10m Numéro d’échelon 11.13m 10 m 100-00035565 ind.C - 09/2020 Page 10 sur 41...
  • Page 13 NEOLIUM LINE 200-250-300-400-600 NEOLIUM LINE 200/250/300/400 et 600 12m Numéro d’échelon 13.13m 12 m 100-00035565 ind.C - 09/2020 Page 11 sur 41...
  • Page 14: Précautions De Montage Et D'utilisation

    NEOLIUM LINE 200-250-300-400-600 1-5. Précautions de montage et d'utilisation • Assembler l'échafaudage suivant ce manuel de montage et d'utilisation. • S'assurer que toutes les goupilles nécessaires et tous les verrous soient bien en place. • Le NEOLIUM doit être monté et démonté uniquement par un personnel formé aux instructions de montage et d'utilisation.
  • Page 15: Chapitre 2: Le Montage De La Version Simple Et Double Largeur

    Chapitre 2: Le montage de la version simple et double largeur 2-1. Montage du NEOLIUM LINE 200/250 et 300 2m Le montage d'un échafaudage s'effectue à 2 personnes minimum • Avant toute opération, bloquer à l’aide du pied les roues grâce à leurs freins.
  • Page 16: Montage Des Diagonales

    NEOLIUM LINE 200-250-300-400-600 2-1-3. Montage des diagonales • Les 2 diagonales de base se prennent sur les échelons n°2 et 5 • Vérifier ensuite le niveau de la base à l’aide d’un niveau à bulle en 3 phases (A, B et C), régler si nécessaire avec le réglage de la roue.
  • Page 17: Montage Des 2 Rallonges De 1M00

    NEOLIUM LINE 200-250-300-400-600 2-1-5. Montage des 2 rallonges de 1m00 • Verrouiller les deux échelles par 4 goupilles clip tube Ø10 Le retour de la goupille doit-être placé à l’extérieur de la structure 2-1-6. Mise en place du plancher à trappe •...
  • Page 18: Montage Des 4 Lisses

    NEOLIUM LINE 200-250-300-400-600 2-1-7. Montage des 4 lisses • Pour le montage des lisses, il faut venir s’assoir sur le plancher à trappe, ensuite : a/ Fixer 2 lisses de chaque côté et sur l’échelon n°11, venir plaquer chaque lisse contre son montant.
  • Page 19: Montage Des Stabilisateurs

    NEOLIUM LINE 200-250-300-400-600 2-1-9. Montage des stabilisateurs • Les 4 stabilisateurs se fixent sur le montant entre le 1 ème ème ème et 2 échelon et entre le 10 et 11 échelon • Etapes à réaliser 4 fois Bien serrer...
  • Page 20: Montage Du Neolium Line 200/250 Et 300 1M

    NEOLIUM LINE 200-250-300-400-600 2-2. Montage du NEOLIUM LINE 200/250 et 300 1m • Lisse et sous lisse montées sur échelon n°7 et n°5 • 1 diagonale de base montée sur échelon n°4 et n°7 • Plancher à trappe monté sur échelon n°3 2.3.
  • Page 21: Montage Du Neolium Line 200/250 Et 300 4M

    NEOLIUM LINE 200-250-300-400-600 2-4. Montage du NEOLIUM LINE 200/250 et 300 4m • Reprendre à l’identique l’ensemble du §2 pour le montage du NEOLIUM 200/250 et 300 2m • Montage des 2 rallonges 2m00 suivant le § 2-1-5 • Montage du plancher à trappe suivant le § 2-1-6, il est monté sur l’échelon n°15 •...
  • Page 22: Montage Du Neolium Line 200/250 Et 300 6M

    NEOLIUM LINE 200-250-300-400-600 2-6. Montage du NEOLIUM LINE 200/250 et 300 6m • Reprendre à l’identique l’ensemble du chapitre 2-4 pour le montage du NEOLIUM 200/250 et 300 4m • Montage des 2 rallonges 2m00 suivant le § 2-1-5 • Montage du plancher à trappe suivant le § 2-1-6, il est monté sur l’échelon n°23 •...
  • Page 23: Montage Du Neolium Line 200/250 Et 300 7M

    NEOLIUM LINE 200-250-300-400-600 2-7. Montage du NEOLIUM LINE 200/250 et 300 7m • Reprendre à l’identique l’ensemble du chapitre 2-5 pour le montage du NEOLIUM 200/250 et 300 5m • A partir de 7m, l’ensemble stabilisateur + extension remplace le stabilisateur simple •...
  • Page 24: Montage Du Neolium Line 200/250 Et 300 8M

    NEOLIUM LINE 200-250-300-400-600 2-8. Montage du NEOLIUM LINE 200/250 et 300 8m • Reprendre à l’identique l’ensemble du chapitre 2-6 pour le montage du NEOLIUM 200/250 et 300 6m • A partir de 8m, l’ensemble stabilisateur + extension remplace le stabilisateur simple •...
  • Page 25: Montage De L'extension Stabilisateur

    NEOLIUM LINE 200-250-300-400-600 2-8-1. Montage de l’extension stabilisateur Etape 2 : Desserrer la vise papillon pour retirer Etape 1 : le patin antidérapant du stabilisateur Etape 3 : A. Insérer l’extension dans le stabilisateur par le bas le stabilisateur. B. Verrouiller l’ensemble avec la goupille clip tube. (B) C.
  • Page 26 NEOLIUM LINE 200-250-300-400-600 Etape 4 : Réassembler le patin anti dérapant avec la vis M8 et le verrouiller avec l’écrou papillon. 2,5m 0.10m 0,56 m 100-00035565 ind.C - 09/2020 Page 24 sur 41...
  • Page 27: Empattement Des Échafaudages

    NEOLIUM LINE 200-250-300-400-600 2-8-2. Empattement minimum des échafaudages Cas 1 : Utilisation normale : Cas 2 : Utilisation face à un mur : Long 135° γ α 90° Lat mur β 135° Long mur Cas n°1 : Utilisation Normale Type...
  • Page 28: Montage Du Neolium Line 200/250 Et 300 9M

    NEOLIUM LINE 200-250-300-400-600 2-9. Montage du NEOLIUM LINE 200/250 et 300 9m • Reprendre à l’identique l’ensemble du chapitre 2-7 pour le montage du NEOLIUM 200/250 et 300 7m • Montage des 2 rallonges 2m00 suivant le § 2-1-5 • Montage du plancher à trappe suivant le § 2-1-6, il est monté sur l’échelon n°35 •...
  • Page 29: Montage Du Neolium Line 200/250 Et 300 10M

    NEOLIUM LINE 200-250-300-400-600 2-10. Montage du NEOLIUM LINE 200/250 et 300 10m • Reprendre à l’identique l’ensemble du chapitre 2-5 pour le montage du NEOLIUM 200/250 et 300 8m • Montage des 2 rallonges 2m00 suivant le § 2-1-5 • Montage du plancher à trappe suivant le § 2-1-6, il est monté sur l’échelon n°39 •...
  • Page 30: Montage Du Neolium Line 200/250 Et 300 11M

    NEOLIUM LINE 200-250-300-400-600 2-11. Montage du NEOLIUM LINE 200/250 et 300 11m • Reprendre à l’identique l’ensemble du chapitre 2-9 pour le montage du NEOLIUM 200/250 et 300 9m • Montage des 2 rallonges 2m00 suivant le § 2-1-5 • Montage du plancher à trappe suivant le § 2-1-6, il est monté sur l’échelon n°43 •...
  • Page 31: Montage Du Neolium Line 200/250 Et 300 12M

    NEOLIUM LINE 200-250-300-400-600 2-12. Montage du NEOLIUM LINE 200/250 et 300 12m • Reprendre à l’identique l’ensemble du chapitre 2-10 pour le montage du NEOLIUM 200/250 et 300 10m • Montage des 2 rallonges 2m00 suivant le § 2-1-5 • Montage du plancher à trappe suivant le § 2-1-6, il est monté sur l’échelon n°47 •...
  • Page 32: Montage Du Neolium Line 400 Et 600 1M

    NEOLIUM LINE 200-250-300-400-600 2-13. Montage du NEOLIUM LINE 400 et 600 1m • Reprendre à l’identique l’ensemble du §2-1 pour le montage du NEOLIUM 400/600 1m • Intégration du plateau sans trappe au même niveau que celui avec trappe Berceau d’accès échelle...
  • Page 33: Montage Du Neolium Line 400 Et 600 2M

    NEOLIUM LINE 200-250-300-400-600 2-14. Montage du NEOLIUM LINE 400 et 600 2m • Reprendre à l’identique l’ensemble du §2-2 pour le montage du NEOLIUM 200/250 et 300 2m • Intégration du plateau sans trappe au même niveau que celui avec trappe 2-15.
  • Page 34: Montage Du Neolium Line 400 Et 600 4M

    NEOLIUM LINE 200-250-300-400-600 2-16. Montage du NEOLIUM LINE 400 et 600 4m • Reprendre à l’identique l’ensemble du §2-4 pour le montage du NEOLIUM 200/250 et 300 4m • Intégration du plateau sans trappe au même niveau que celui avec trappe 2-17.
  • Page 35: Montage Du Neolium Line 400 Et 600 6M

    NEOLIUM LINE 200-250-300-400-600 2-18. Montage du NEOLIUM LINE 400 et 600 6m • Reprendre à l’identique l’ensemble du §2-6 pour le montage du NEOLIUM 200/250 et 300 6m • Intégration du plateau sans trappe au même niveau que celui avec trappe 2-19.
  • Page 36: Montage Du Neolium Line 400 Et 600 8M

    NEOLIUM LINE 200-250-300-400-600 2-20. Montage du NEOLIUM LINE 400 et 600 8m • Reprendre à l’identique l’ensemble du §2-8 pour le montage du NEOLIUM 200/250 et 300 8m • Intégration du plateau sans trappe au même niveau que celui avec trappe 2-21.
  • Page 37: Montage Du Neolium Line 400 Et 600 10M

    NEOLIUM LINE 200-250-300-400-600 2-22. Montage du NEOLIUM LINE 400 et 600 10m • Reprendre à l’identique l’ensemble du §2-10 pour le montage du NEOLIUM 200/250 et 300 10m • Intégration du plateau sans trappe au même niveau que celui avec trappe 2-23.
  • Page 38: Montage Du Neolium Line 400 Et 600 12M

    NEOLIUM LINE 200-250-300-400-600 2-24. Montage du NEOLIUM LINE 400 et 600 12m • Reprendre à l’identique l’ensemble du §2-12 pour le montage du NEOLIUM 200/250 et 300 12m • Intégration du plateau sans trappe au même niveau que celui avec trappe 100-00035565 ind.C - 09/2020...
  • Page 39: Montage En Décalage De Niveau

    NEOLIUM LINE 200-250-300-400-600 2-25. Montage en décalage de niveau Echelle de base Rallonge 1m00 Rallonge 2m00 Ce montage ne s’applique qu’à des escaliers et ne peut être utilisé sur un plan incliné. Vérifier le bon fonctionnement des freins des roues.
  • Page 40: Chapitre 4: Consignes

    NEOLIUM LINE 200-250-300-400-600 Chapitre 4: Consignes 4-1. Consignes d’utilisation Cette notice ne remplace pas la réglementation en vigueur à laquelle il convient de se référer. • Respecter les charges admissibles sur les planchers et la structure. • Les forces horizontales ne doivent pas dépasser 30Kg (soit 30 daN).
  • Page 41: Chapitre 5: Montage Pour Transport Et Passage De Portes

    NEOLIUM LINE 200-250-300-400-600 Chapitre 5: Montage pour transport et passage de portes Le NEOLIUM peut passer dans une porte de 0.93m mini de largeur et 2.1m de hauteur libre mini. Possibilité également de transporter le matériel et du petit outillage.
  • Page 42 NEOLIUM LINE 200-250-300-400-600 MAINTENANCE Maintenir les pièces propres et les dispositifs de sécurité en bon état de fonctionnement. Remplacer ou nettoyer toutes les plaques ou autocollants endommagés donnant les consignes d'utilisation et de sécurité. Pour connaître le SAV des différentes pièces se connecter au site internet : http://tubesca-comabi.com/documentation-technique/...
  • Page 43: Chapitre 7: Démontage

    NEOLIUM LINE 200-250-300-400-600 Chapitre 7: Démontage • Avant le démontage : - S'assurer de la stabilité de l’échafaudage : _ roues à frein bloquées. _ stabilisateurs bien positionnés etc... - S'équiper de cordes pour manutentionner les éléments si besoin. - Le port des EPI est obligatoire.
  • Page 44 NEOLIUM LINE 200-250-300-400-600 ENGLISH 100-00035566 ind.C - 09/2020...
  • Page 45 NEOLIUM LINE 200-250-300-400-600 Mobile scaffolding assembly & operating manual This manual MUST always be made available to users Instruction manual EN 1298-IM-en CEBTP PV test N° BMA6-H-0135 100-00035565 ind.C – 09/2020 Page 1 of 41...
  • Page 46 2-1-8. Fitting skirting boards ................................16 2-1-9. Fitting the stabilizers ................................17 2-2. Assembly of the NEOLIUM LINE 200/250 and 300 1m ....................... 18 2-3. Assembly of the NEOLIUM LINE 200/250 and 300 3m ....................... 18 2-4. Assembly of NEOLIUM LINE 200/250 and 300 4m ........................19 2-5.
  • Page 47: Chapter 1: Scaffolding: Technical Characteristics

    NEOLIUM LINE 200-250-300-400-600 Chapter 1: Scaffolding: Technical characteristics 1-1 Marking EN 1004 3 / 12M XXXD Access by stairs: no Maximum height for Maximum height for Reference to Class of Access by steps: no indoor use load outdoor use standards...
  • Page 48: Parts List For The Different Models

    NEOLIUM LINE 200-250-300-400-600 1-3. Parts list for the different models 1-3-1. Single width version: 200/250 and 300 100-00035565 ind.C – 09/2020 Page 4 of 41...
  • Page 49: Double Width Version: 400 Et 600

    NEOLIUM LINE 200-250-300-400-600 1-3-2. Double width version: 400 & 600 100-00035565 ind.C – 09/2020 Page 5 of 41...
  • Page 50: Assembly Diagrams For The Different Models (Per Size)

    NEOLIUM LINE 200-250-300-400-600 1-4. Assembly diagrams for the different models (per size) Base ladder or double base ladder 1m extension or 1m double extension 2m extension or 2m double Extension 1 platform with trapdoor / 1 platform without trapdoor (version LINE 400 et 600)
  • Page 51 NEOLIUM LINE 200-250-300-400-600 NEOLIUM LINE 200/250/300/400 & 600 2m 2m00 /2m50 / 3m00 Rung n° 3.13 m NEOLIUM LINE 200/250/300/400 & 600 4m Rung n° 5.13m 100-00035565 ind.C – 09/2020 Page 7 of 41...
  • Page 52 NEOLIUM LINE 200-250-300-400-600 NEOLIUM LINE 200/250/300/400 & 600 6m Rung n° 7.13m 100-00035565 ind.C – 09/2020 Page 8 of 41...
  • Page 53 NEOLIUM LINE 200-250-300-400-600 NEOLIUM LINE 200/250/300/400 & 600 8m Rung n° 9.13m 100-00035565 ind.C – 09/2020 Page 9 of 41...
  • Page 54 NEOLIUM LINE 200-250-300-400-600 NEOLIUM LINE 200/250/300/400 & 600 10m Rung n° 11.13m 10 m 100-00035565 ind.C – 09/2020 Page 10 of 41...
  • Page 55 NEOLIUM LINE 200-250-300-400-600 NEOLIUM LINE 200/250/300/400 & 600 12m Rung n° 13.13m 12 m 100-00035565 ind.C – 09/2020 Page 11 of 41...
  • Page 56: Precautions For Assembly And Use

    NEOLIUM LINE 200-250-300-400-600 1-5. Precautions for assembly and use • Assemble the scaffolding as per this assembly and operating manual. • Make sure that all the necessary pins and catches are locked correctly in place. • The NEOLIUM most only be assembled and dismantled by personnel trained for its assembly and use.
  • Page 57: Chapter 2: Assembly Of Single And Double Width Versions

    Chapter 2: Assembly of single and double width versions 2-1. Assembly of the NEOLIUM LINE 200/250 and 300 2m Scaffolding must be erected by at least 2 persons • Before carrying out any operation, lock the wheels in position with their brakes ‘On’.
  • Page 58: Fitting The Diagonals

    NEOLIUM LINE 200-250-300-400-600 2-1-3. Fitting the diagonals • The 2 base diagonals are connected to rungs n°2 and 5. • Then check the level of the base with a spirit level in 3 phases (A, B, and C). Adjust if necessary using the wheel adjustment system.
  • Page 59: Fitting The Two 1-Metre Extensions

    NEOLIUM LINE 200-250-300-400-600 2-1-5. Fitting the two 1-metre extensions • Lock the two ladders in position with 4 tube pin clips Ø10 The pin lock must be placed on the outside of the structure 2-1-6. Fitting the platform with a trapdoor •...
  • Page 60: Fitting The 4 Struts

    NEOLIUM LINE 200-250-300-400-600 2-1-7 Fitting the 4 struts • Sit on the platform with the trapdoor for fitting the struts. Then: a/ Fix 2 struts on either side of rung n°11 and push each strut against its upright. b/ Fix 2 struts on either side of rung n°9 and push each strut against its upright.
  • Page 61: Fitting The Stabilizers

    NEOLIUM LINE 200-250-300-400-600 2-1-9: Fitting the stabilizers • The 4 stabilizers are fitted to the upright between the 1 and 2 rung and the 10 and 11 rung. • These steps must be carried out 4 times Tighten the collar firmly...
  • Page 62: Assembly Of The Neolium Line 200/250 And 300 1M

    NEOLIUM LINE 200-250-300-400-600 2-2 Assembly of the NEOLIUM LINE 200/250 and 300 1m • Strut and under-strut fitted to rungs n°7 and n°5 • 1 base diagonal fitted to rungs n°4 and n°7 • Platform with trapdoor mounted on rung n° 3 2.3.
  • Page 63: Assembly Of Neolium Line 200/250 And 300 4M

    NEOLIUM LINE 200-250-300-400-600 2-4 Assembly of the NEOLIUM LINE 200/250 and 300 4m • Carry out all the procedures described in §2 for assembling the NEOLIUM 200/250 and 300 2m • Fit the two 2-metre extensions as per § 2-1-5 •...
  • Page 64: Assembly Of Neolium Line 200/250 And 300 6M

    NEOLIUM LINE 200-250-300-400-600 2-6. Assembly of the NEOLIUM LINE 200/250 and 300 6m • Carry out all the procedures described in chapter 2-4 for assembling the NEOLIUM 200/250 and 300 4m • Fit the two 2-metre extensions as per § 2-1-5 •...
  • Page 65: Assembly Of Neolium Line 200/250 And 300 7M

    NEOLIUM LINE 200-250-300-400-600 2-7. Assembly of the NEOLIUM LINE 200/250 and 300 7m • Carry out all the procedures described in chapter 2-5 for the assembly of the NEOLIUM 200/250 and 300 5m • For scaffolding 7 metres high and over, the simple stabilizer must be replaced by the stabilizer + extension assembly •...
  • Page 66: Assembly Of Neolium Line 200/250 And 300 8M

    NEOLIUM LINE 200-250-300-400-600 2-8 Assembly of the NEOLIUM LINE 200/250 and 300 8m • Carry out all the procedures described in chapter 2-6 for assembling the NEOLIUM 200/250 and 300 6m • For scaffolding 8 metres high and over, the simple stabilizer must be replaced by the stabilizer + extension assembly •...
  • Page 67: Fitting The Stabilizer Extension

    NEOLIUM LINE 200-250-300-400-600 2-8-1. Fitting the stabilizer extension Step 2: Loosen the butterfly screw for Step 1: removing the non-slip pad on the stabilizer Step 3: Insert the extension into the stabilizer from underneath. Lock the unit in place with the tube pin clip. (B) Tighten the stabilizer collar onto the extension arm.
  • Page 68 NEOLIUM LINE 200-250-300-400-600 Step 4: Refit the anti-slip pad in place with the M8 screw and lock in position with the nut. 2.5m 0.10m 0.56 m 100-00035565 ind.C – 09/2020 Page 24 of 41...
  • Page 69: Surface Area Covered

    NEOLIUM LINE 200-250-300-400-600 2-8-2. Minimum surface area covered Case 1: Normal use: Case 2: Use opposite a wall: Long γ 135° 90° α Wall lat β 135° Wall Long Case n°1: Normal use Type Simple stabilizer 2m - 4m - 6m...
  • Page 70 NEOLIUM LINE 200-250-300-400-600 2-9 Assembly of the NEOLIUM LINE 200/250 and 300 9m • Carry out all the procedures described in chapter 2-7 for assembling the NEOLIUM 200/250 and 300 7m • Fit the two 2-metre extensions as per § 2-1-5 •...
  • Page 71 NEOLIUM LINE 200-250-300-400-600 2-10 Assembly of the NEOLIUM LINE 200/250 and 300 10m • Carry out all the procedures described in chapter 2-5 for assembling the NEOLIUM 200/250 and 300 8m • Fit the two 2-metre extensions as per § 2-1-5 •...
  • Page 72 NEOLIUM LINE 200-250-300-400-600 2-11 Assembly of the NEOLIUM LINE 200/250 and 300 11m • Carry out all the procedures described in chapter 2-9 for assembling the NEOLIUM 200/250 and 300 9m • Fit the two 2-metre extensions as per § 2-1-5 •...
  • Page 73 NEOLIUM LINE 200-250-300-400-600 2-12 Assembly of the NEOLIUM LINE 200/250 and 300 12m • Carry out all the procedures described in chapter 2-10 for the assembly of the NEOLIUM 200/250 and 300 10m • Fit the two 2-metre extensions as per § 2-1-5 •...
  • Page 74 NEOLIUM LINE 200-250-300-400-600 2-13. Assembly of the NEOLIUM LINE 400 et 600 1m • Carry out all the procedures described in §2-1 for assembling the NEOLIUM 400/600 1m • Fit the platform without a trapdoor at the same level as the platform with a trapdoor...
  • Page 75: Assembly Of Neolium Line 400 And 600 2M

    NEOLIUM LINE 200-250-300-400-600 2-14. Assembly of the NEOLIUM LINE 400 and 600 2m • Carry out all the procedures described in §2-2 for assembling the NEOLIUM 200/250 and 300 2m • Fit the platform without a trapdoor at the same level as the platform with a trapdoor 2-15 Assembly of the NEOLIUM LINE 400 and 600 3m •...
  • Page 76: Assembly Of Neolium Line 400 And 600 4M

    NEOLIUM LINE 200-250-300-400-600 2-16. Assembly of the NEOLIUM LINE 400 and 600 4m • Carry out all the procedures described in §2-4 for assembling the NEOLIUM 200/250 and 300 4m • Fit the platform without a trapdoor at the same level as the platform with a trapdoor 2-17 Assembly of the NEOLIUM LINE 400 and 600 5m •...
  • Page 77: Assembly Of Neolium Line 400 And 600 6M

    NEOLIUM LINE 200-250-300-400-600 2-18. Assembly of the NEOLIUM LINE 400 and 600 6m • Carry out all the procedures described in §2-6 for assembling the NEOLIUM 200/250 and 300 6m • Fit the platform without a trapdoor at the same level as the platform with a trapdoor 2-19 Assembly of the NEOLIUM LINE 400 and 600 7m •...
  • Page 78: Assembly Of Neolium Line 400 And 600 8M

    NEOLIUM LINE 200-250-300-400-600 2-20. Assembly of the NEOLIUM LINE 400 and 600 8m • Carry out all the procedures described in §2-8 for assembling the NEOLIUM 200/250 and 300 8m • Fit the platform without a trapdoor at the same level as the platform with a trapdoor 2-21 Assembly of the NEOLIUM LINE 400 and 600 9m •...
  • Page 79 NEOLIUM LINE 200-250-300-400-600 2-22. Assembly of the NEOLIUM LINE 400 et 600 10m • Carry out all the procedures described in §2-10 for assembling the NEOLIUM 200/250 and 300 10m Fit the platform without a trapdoor at the same level as the platform with a trapdoor •...
  • Page 80: Assembly Of Neolium Line 400 And 600 12M

    NEOLIUM LINE 200-250-300-400-600 2-24 Assembly of the NEOLIUM LINE 400 and 600 12m ▪ Carry out all the procedures described in §2-12 for assembling the NEOLIUM 200/250 and 300 12m ▪ Fit the platform without a trapdoor at the same level as the platform with a trapdoor 100-00035565 ind.C –...
  • Page 81: Assembly For Use On Different Floor Levels

    NEOLIUM LINE 200-250-300-400-600 2-25 Assembly for use on different floor levels Base ladder 1m00 extension 2m00 extension This type of assembly can only be used on staircases and may not be used on sloping surfaces. Check that wheel-brakes operate correctly.
  • Page 82: Chapter 4: Instructions

    NEOLIUM LINE 200-250-300-400-600 Chapter 4: Instructions 4-1 Instructions for use These instructions do not replace regulations in force, which must also be followed. • Comply with permissible loads on the flooring and the structure • Horizontal forces must not be over 30Kg (or 30 daN).
  • Page 83: Chapter 5: Assembly For Transport And Going Through Doorways

    NEOLIUM LINE 200-250-300-400-600 Chapter 5: Assembly for transport and going through doorways The NEOLIUM can go through a doorway with a minimum width of 0.93m and a minimum vertical height of 2.1m. Other equipment and small tooling may also be transported.
  • Page 84 NEOLIUM LINE 200-250-300-400-600 MAINTENANCE Keep parts clean and maintain safety devices in good running order. Replace or clean any damaged labels or stickers providing instructions on how to use the unit or on its safety. For any after-sales service on the different parts, visit our internet site: http://tubesca-comabi.com/documentation-technique/...
  • Page 85: Chapter 7: Dismantling

    NEOLIUM LINE 200-250-300-400-600 Chapter 7: Dismantling • Before dismantling: - Make sure that the scaffolding is stable: _that the wheel brakes are on _ that stabilizers are correctly positioned, etc. - If necessary, use ropes for handling the different elements.
  • Page 86 NEOLIUM LINE 200-250-300-400-600 ESPANOL 100-00035566 ind.C - 09/2020...
  • Page 87 NEOLIUM LINE 200-250-300-400-600 Manual de montaje y de utilización andamio con ruedas Este manual debe ser entregado imperativamente a los usuarios Manual de instrucciones EN 1298-IM-es PV prueba CEBTP N° BMA6-H-0135 100-00035565 ind.C – 09/2020 Pág. 1 de 42 09/01/2018...
  • Page 88 1-5.Precauciones de montaje y de utilización ........................... 12 Capítulo 2: Montaje de la versión de anchura simple y doble ....................13 2-1.Montaje del NEOLIUM LINE 200/250 y 300 2 m ......................... 13 2-1-1. Montaje de las ruedas ................................13 2-1-2. Montaje de las barras bajas ..............................13 2-1-3.
  • Page 89: 1-2.Características Técnicas

    NEOLIUM LINE 200-250-300-400-600 Capítulo 1: Características técnicas del andamio 1-1. Marcado EN 1004 3 / 12M XXXD Referencia a la Clase de Altura máxima para Acceso por escalera: no Altura máxima para norma carga uso en interior Acceso por escalera con peldaño: no...
  • Page 90: 1-3.Nomenclatura De Los Diferentes Modelos

    NEOLIUM LINE 200-250-300-400-600 1-3. Nomenclatura de los diferentes modelos 1-3-1. Versión anchura simple: 200/250 y 300 100-00035565 ind.C – 09/2020 Pág. 4 de 42 09/01/2018...
  • Page 91: Versión Anchura Doble: 400 Y 600

    NEOLIUM LINE 200-250-300-400-600 1-3-2. Versión anchura doble: 400 y 600 100-00035565 ind.C – 09/2020 Pág. 5 de 42 09/01/2018...
  • Page 92: 1-4.Esquemas De Composición De Los Modelos (Por Tamaño)

    NEOLIUM LINE 200-250-300-400-600 1-4. Esquemas de composición de los modelos (por tamaño) Escalera de base o escalera doble de base Alargador 1m o alargador doble 1m Alargador 2m o alargador doble 2m 1 plataforma con trampilla / 1 platataforma sin (versión LINE 400 et 600)
  • Page 93 NEOLIUM LINE 200-250-300-400-600 NEOLIUM LINE 200/250/300/400 y 600 2m 2m00 /2m50 / 3m00 Número de escalones 3.13 m NEOLIUM LINE 200/250/300/400 y 600 4m Número de escalones 5.13m Pág. 7 de 42 100-00035565 ind.C – 09/2020...
  • Page 94 NEOLIUM LINE 200-250-300-400-600 NEOLIUM LINE 200/250/300/400 y 600 6m Número de escalones 7.13m Pág. 8 de 42 100-00035565 ind.C – 09/2020...
  • Page 95 NEOLIUM LINE 200-250-300-400-600 NEOLIUM LINE 200/250/300/400 y 600 8m Número de escalones 9.13m Pág. 9 de 42 100-00035565 ind.C – 09/2020...
  • Page 96 NEOLIUM LINE 200-250-300-400-600 NEOLIUM LINE 200/250/300/400 y 600 10m Número de escalones 11.13m 10 m Pág. 10 de 42 100-00035565 ind.C – 09/2020...
  • Page 97 NEOLIUM LINE 200-250-300-400-600 NEOLIUM LINE 200/250/300/400 y 600 12m Número de escalones 13.13m 12 m Pág. 11 de 42 100-00035565 ind.C – 09/2020...
  • Page 98: 1-5.Precauciones De Montaje Y De Utilización

    NEOLIUM LINE 200-250-300-400-600 1-5. Precauciones de montaje y de utilización • Monte el andamio siguiendo las consignas de este manual de montaje y de utilización. • Compruebe que todas las clavijas necesarias y que todos los cerrojos están en su lugar.
  • Page 99: Capítulo 2: Montaje De La Versión De Anchura Simple Y Doble

    Capítulo 2 Montaje de la versión de anchura simple y doble 2-1. Montaje del NEOLIUM LINE 200/250 y 300 2 m El montaje de un andamio han de hacerlo 2 personas como mínimo • Antes de cualquier operación, bloquee con el pie las ruedas gracias a sus frenos.
  • Page 100: Montaje De Las Diagonales

    NEOLIUM LINE 200-250-300-400-600 2-1-3. Montaje de las diagonales • Las 2 barras diagonales de base se enganchan en los escalones n.º 2 y n.º 5 • Compruebe luego el nivel de base utilizando un nivel de burbuja de 3 fases (A, B y C), en caso necesario regule con el ajuste de la rueda.
  • Page 101: Montaje De Los 2 Alargadores De 1,00 M

    NEOLIUM LINE 200-250-300-400-600 2-1-5. Montaje de los 2 alargadores de 1,00 m • Bloquee las 2 escaleras con 4 clavijas clip de tubo Ø10 El retorno de la clavija debe situarse en el exterior de la estructura 2-1-6. Colocación del suelo con trampilla •...
  • Page 102: Montaje De Las 4 Barras Bajas

    NEOLIUM LINE 200-250-300-400-600 2-1-7. Montaje de las 4 barras bajas • Para el montaje de las barras bajas, es preciso intervenir en el suelo de trampilla, y luego: a/ Fijar 2 barras bajas por cada lado y en el escalón n.º 11 y sujetar cada barra baja contra su montante.
  • Page 103: Montaje De Los Estabilizadores

    NEOLIUM LINE 200-250-300-400-600 2-1-9. Montaje de los estabilizadores • Los 4 estabilizadores se fijan en el montante, entre el escalón n.º 1 y el n.º 2 y entre el escalón n.º 10 y n.º 11 • Etapas a realizar 4 veces Apriete bien el collarín...
  • Page 104: 2-2.Montaje Del Neolium Line 200/250 Y 300 1M

    NEOLIUM LINE 200-250-300-400-600 2-2. Montaje del NEOLIUM LINE 200/250 y 300 1 m • Barra baja e inferior en los escalones n.º 7 y n.º 5 • 1 diagonal de base montada en el escalón n.º 4 y n.º 7 •...
  • Page 105: 2-4.Montaje Del Neolium Line 200/250 Y 300 4M

    NEOLIUM LINE 200-250-300-400-600 2-4. Montaje del NEOLIUM LINE 200/250 y 300 4 m • Retome de manera idéntica el conjunto del párrafo 2 para el montaje del NEOLIUM 200/250 y 300 2 m • Montaje de los 2 alargadores 2,00 m según el párrafo 2-1-5 •...
  • Page 106: 2-6.Montaje Del Neolium Line 200/250 Y 300 6M

    NEOLIUM LINE 200-250-300-400-600 2-6. Montaje del NEOLIUM LINE 200/250 y 300 6 m • Retome de manera idéntica el conjunto del capítulo 2-4 para el montaje del NEOLIUM 200/250 y 300 4 m • Montaje de los 2 alargadores 2,00 m según el párrafo 2-1-5 •...
  • Page 107: 2-7.Montaje Del Neolium Line 200/250 Y 300 7M

    NEOLIUM LINE 200-250-300-400-600 2-7. Montaje del NEOLIUM LINE 200/250 y 300 7 m • Retome de manera idéntica el conjunto del capítulo 2-5 para el montaje del NEOLIUM 200/250 y 300 5 m • A partir de 7 m, el conjunto estabilizador + extensión reemplaza el estabilizador simple •...
  • Page 108: 2-8.Montaje Del Neolium Line 200/250 Y 300 8M

    NEOLIUM LINE 200-250-300-400-600 2-8. Montaje del NEOLIUM LINE 200/250 y 300 8 m • Retome de manera idéntica el conjunto del capítulo 2-6 para el montaje del NEOLIUM 200/250 y 300 6m • A partir de 8m, el conjunto estabilizador + extensión reemplaza el estabilizador simple •...
  • Page 109: Montaje De La Extensión Del Estabilizador

    NEOLIUM LINE 200-250-300-400-600 2-8-1. Montaje de la extensión del estabilizador Etapa 2: Afloje el tornillo mariposa para retirar el patín antideslizante del estabilizador Etapa 1: Etapa 3: Inserte la extensión en el estabilizador por la parte baja del estabilizador. Bloquee el conjunto con la clavija clip tubo. (B) Apriete el collarín del estabilizador en el brazo de extensión.
  • Page 110 NEOLIUM LINE 200-250-300-400-600 Etapa 4: Monte el patín antideslizante con el tornillo M8 y bloquéelo con la tuerca mariposa. 2,5 m 0,10 m 0,56 m Pág. 24 de 42 100-00035565 ind.C – 09/2020...
  • Page 111 NEOLIUM LINE 200-250-300-400-600 2-8-2. Distancia entre ejes mínima de los andamios Caso 1: Utilización normal: Caso 2: Utilización frente a un muro: Long. α 135° γ 90° muro β 135° Long muro Caso n.º 1: Utilización normal: Tipo Estabilizador simple...
  • Page 112: 2-9.Montaje Del Neolium Line 200/250 Y 300 9M

    NEOLIUM LINE 200-250-300-400-600 2-9. Montaje del NEOLIUM LINE 200/250 y 300 9 m • Retome de manera idéntica el conjunto del capítulo 2-7 para el montaje del NEOLIUM 200/250 y 300 7 m • Montaje de los 2 alargadores 2,00 m según el párrafo 2-1-5 •...
  • Page 113: 2-10.Montaje Del Neolium Line 200/250 Y 300 10M

    NEOLIUM LINE 200-250-300-400-600 2-10. Montaje del NEOLIUM LINE 200/250 y 300 10 m • Retome de manera idéntica el conjunto del capítulo 2-5 para el montaje del NEOLIUM 200/250 y 300 8 m • Montaje de los 2 alargadores 2,00 m según el párrafo 2-1-5 •...
  • Page 114: 2-11.Montaje Del Neolium Line 200/250 Y 300 11M

    NEOLIUM LINE 200-250-300-400-600 2-11. Montaje del NEOLIUM LINE 200/250 y 300 11 m • Retome de manera idéntica el conjunto del capítulo 2-9 para el montaje del NEOLIUM 200/250 y 300 9 m • Montaje de los 2 alargadores 2,00 m según el párrafo 2-1-5 •...
  • Page 115: 2-12.Montaje Del Neolium Line 200/250 Y 300 12M

    NEOLIUM LINE 200-250-300-400-600 2-12. Montaje del NEOLIUM LINE 200/250 y 300 12 m • Retome de manera idéntica el conjunto del capítulo 2-10 para el montaje del NEOLIUM 200/250 y 300 10 m • Montaje de los 2 alargadores 2,00 m según el párrafo 2-1-5 •...
  • Page 116: Montaje Del Neolium Line 400 Y 600 1 M

    NEOLIUM LINE 200-250-300-400-600 2-13. Montaje del NEOLIUM LINE 200/400 y 600 1 m • Retome de manera idéntica el conjunto del párrafo 2-1 para el montaje del NEOLIUM 400/600 1 m • Integración de la plataforma sin trampilla al mismo nivel que el que tiene trampilla...
  • Page 117: Montaje Del Neolium Line 400 Y 600 2M

    NEOLIUM LINE 200-250-300-400-600 2-14. Montaje del NEOLIUM LINE 200/400 y 600 2 m • Retome de manera idéntica el conjunto del párrafo 2-2 para el montaje del NEOLIUM 200/250 y 300 2 m • Integración de la plataforma sin trampilla al mismo nivel que el que tiene trampilla 2-15.
  • Page 118: Montaje Del Neolium Line 400 Y 600 4M

    NEOLIUM LINE 200-250-300-400-600 2-16. Montaje del NEOLIUM LINE 200/400 y 600 4 m • Retome de manera idéntica el conjunto del párrafo 2-4 para el montaje del NEOLIUM 200/250 y 300 4 m • Integración de la plataforma sin trampilla al mismo nivel que el que tiene trampilla 2-17.
  • Page 119: Montaje Del Neolium Line 400 Y 600 6M

    NEOLIUM LINE 200-250-300-400-600 2-18. Montaje del NEOLIUM LINE 200/400 y 600 6 m • Retome de manera idéntica el conjunto del párrafo 2-6 para el montaje del NEOLIUM 200/250 y 300 6 m • Integración de la plataforma sin trampilla al mismo nivel que el que tiene trampilla 2-19.
  • Page 120: Montaje Del Neolium Line 400 Y 600 8M

    NEOLIUM LINE 200-250-300-400-600 2-20. Montaje del NEOLIUM LINE 200/400 y 600 8 m • Retome de manera idéntica el conjunto del párrafo 2-8 para el montaje del NEOLIUM 200/250 y 300 8 m • Integración de la plataforma sin trampilla al mismo nivel que el que tiene trampilla 2-21.
  • Page 121: Montaje Del Neolium Line 400 Y 600 10M

    NEOLIUM LINE 200-250-300-400-600 2-22. Montaje del NEOLIUM LINE 200/400 y 600 10 m • Retome de manera idéntica el conjunto del párrafo 2-10 para el montaje del NEOLIUM 200/250 y 300 10 m • Integración de la plataforma sin trampilla al mismo nivel que el que tiene trampilla 2-23.
  • Page 122: Montaje Del Neolium Line 400 Y 600 12M

    NEOLIUM LINE 200-250-300-400-600 2-24. Montaje del NEOLIUM LINE 200/400 y 600 12 m • Retome de manera idéntica el conjunto del párrafo 2-12 para el montaje del NEOLIUM 200/250 y 300 12 m • Integración de la plataforma sin trampilla al mismo nivel que el que tiene trampilla Pág.
  • Page 123: 2-25.Montaje Con Desfase De Nivel

    NEOLIUM LINE 200-250-300-400-600 2-25. Montaje en desfase de nivel Escalera de base Alargador 1,00 m Este montaje sólo se aplica a las Alargador 2,00 m escaleras y no puede ser utilizado en un plano inclinado. Compruebe el buen funcionamiento de los frenos de las ruedas.
  • Page 124: Capítulo 4: Consignas

    NEOLIUM LINE 200-250-300-400-600 Capítulo 4: Consignas 4-1. Consignas de utilización Este manual no reemplaza la reglamentación vigente, a la que es conveniente atenerse. • Respete las cargas admisibles en los suelos y en la estructura. • Las fuerzas horizontales no deben sobrepasar 30 Kg (o sea, 30 daN).
  • Page 125: Capítulo 5: Montaje Para El Transporte Y El Paso De Puertas

    NEOLIUM LINE 200-250-300-400-600 Capítulo 5: Montaje para el transporte y el paso de puertas Altura de puerta Anchura de puerta El NEOLIUM puede pasar por una puerta de 0,93 m mínimo de ancho y 2,1 m de altura libre mínima.
  • Page 126 NEOLIUM LINE 200-250-300-400-600 MANTENIMIENTO Conserve las piezas limpias y los dispositivos de seguridad en buen estado de funcionamiento. Reemplace o limpie todas las placas o los adhesivos deteriorados que indican las consignas de utilización y de seguridad. Para conocer el servicio postventa de las diferentes piezas, conéctese a la página web:...
  • Page 127: Capítulo 7: Desmontaje

    NEOLIUM LINE 200-250-300-400-600 Capítulo 7: Desmontaje • Antes del desmontaje: - Compruebe la estabilidad del andamio: _ ruedas de freno bloqueadas. _ estabilizadores bien situados, etc. - Equiparse con cuerdas para la manutención de los elementos en caso necesario. - Es obligatorio llevar puestos los EPI.
  • Page 128 NEOLIUM LINE 200-250-300-400-600 Pág. 42 de 42 100-00035565 ind.C – 09/2020...