Installation Check-Up - Cimbali M34 SELECTRON Use And Installation

Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 39
WARNING: AFTER INSTALLATION, CHECK TO SEE IF THE MACHINE IS WORKING PROPERLY (see the
Installation Module C).
WATER CONNECTIONS
No leaks from the connections or tubes
FUNCTIONING
Boiler and operating pressures are normal.
The pressure gauge is working properly.
The self-leveling device is working properly.
The expansion valves are working properly
WARNING: ONCE THE MACHINE HAS BEEN INSTALLED AND IS READY FOR USE, BEFORE ALLOWING
THE WORKER TO START USING THE MACHINE, WASH THE INTERNAL COMPONENTS ACCORDING
TO THE INSTRUCTIONS BELOW:
GROUPS
Let each group dispense water for about a minute.
HOT WATER
Continuously dispense hot water (pressing the appropriate button) until at least 5 litres of water have been used
for a machine with 2 groups and 8 litres for a machine with 3 groups (see the "Hot water dispensing" chapter in the
User's Manual).
STEAM (also with Turbosteam)
Dispense steam from the nozzles for about a minute, using the appropriate buttons.

5. Installation Check-up

5 EN

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

1745

Table of Contents