Remote Control Device Installation - TOHATSU MFS 6BZ Owner's Manual

Hide thumbs Also See for MFS 6BZ:
Table of Contents

Advertisement

1
2
1. Bolt (8 × 85)
2. Washer
3. Nut
ENOW00008-A
CAUTION
Upper mounting bolts should be installed
with the bolt head at inside surface of the
transom. Mounting bolts installed with
the threaded end at the inside surface of
the transom can cause personal injury.
Tighten the bolts sufficiency, otherwise
falling down of outboard could be hap-
pened.
ENON00003-1
Notes
1.
2. Be sure to tighten the mounting bolt
3
3. For EP / EFT type, drill the holes in
ENOF00507-1
ENOM00840-0
2. Remote control device
installation
ENOW00850-0
Remote control box location
ENOF00508-0
1. Shift cable
2. Throttle cable
3. Cable harness B
Install the remote control box in a posi-
tion where it is easy to reach and oper-
ate the controls.
INSTALLATION
Apply sealing agent, such as silicone
sealed between the bolts and the
transom board holes before tighten-
ing the bolts.
nuts to the specified torque.
(30 N·m (3.0 kgf·m) 13 ft·lb)
transom board only at left and right of
lower side of clamp bracket, and
attach outboard motor with supplied
bolts.
For EPT type, drill the holes in transom
board at 4 points up and down, right
and left, and attach outboard motor
with supplied bolts.
25
5
3
1, 2
ENOF00841-1

Advertisement

Table of Contents
loading

This manual is also suitable for:

Mfs 8bMfs 9.8b

Table of Contents