All required hardware is included.
Please check the contents with your packing slip.
Read instructions carefully.
Save this document for future reference.
Two people are required for the assembly.
Security Advise
It is recommended to anchor fixed
cabinets in order to avoid accidental
tipping if more than one drawer is
opened at the same time.
Drawers in mobile cabinets must be equipped
with lock-in mechanism in order to avoid
accidental opening.
Never open more than one
drawer at the same time.
Ne jamais ouvrir plus
d'un tiroir à la fois.
rousseaumetal.com
1-800-463-4271
Assembly Guide
The upper drawer
should not be placed
higher than 60" from the floor
unless you have the adequate
equipment to reach the drawers
above 60" in a secure manner.
Le dernier tiroir
ne doit pas être placé
à plus de 60" du sol
à moins que vous ne possédiez
l'équipement adéquat pour
accéder aux tiroirs au-dessus
de 60" de façon sécuritaire.
Guide d'assemblage
Les tiroirs d'un cabinet mobile doivent être
équipés du mécanisme "lock-in" pour éviter
l'ouverture accidentelle.
100 lb *
MAX
lb
* Evenly distributed load
Poids uniformément réparti
60"
Page 1/9
Toute la quincaillerie requise est incluse.
Veuillez vérifier le contenu avec votre
feuille de livraison.
Lisez attentivement les instructions.
Conservez ces instructions
pour référence future.
Deux personnes sont requises
pour l'assemblage.
Consignes de sécurité
Il est recommandé d'ancrer le cabinet
fixe afin d'en éviter le basculement
accidentel si plus d'un tiroir était
ouvert à la fois.
ATTENTION
Please lock or tilt cabinet towards the
back to avoid drawers from opening.
ATTENTION
Verrouiller ou incliner le cabinet vers
l'arrière pour éviter que les tiroirs
s'ouvrent.
Cabinet
Ligne L
L10-SE19B
7D004010

Advertisement

loading
Need help?

Need help?

Do you have a question about the L Line and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Rousseau L Line

  • Page 1 Cabinet Cabinet L Line Ligne L Assembly Guide Guide d’assemblage All required hardware is included. Toute la quincaillerie requise est incluse. Please check the contents with your packing slip. Veuillez vérifier le contenu avec votre Read instructions carefully. feuille de livraison.
  • Page 2 Tools Required Outils requis Phillips #3 Ø 3/16" 1/2" Ø 1/4" 9/16" Cut-resistant gloves Ø 3/8" 1/2'' for concrete Gants anti-coupure pour béton Set up Préparation If you have to turn your cabinet upside Si vous devez retourner votre cabinet down during the installation, remove the pendant l'installation, enlevez les dividers from the drawers.
  • Page 3 Options under Cabinet LA30... continue Options sous un cabinet LA30... suite Floor anchoring hardware kit LA76 Ensemble pour ancrage au sol LA76 Enlevez les tiroirs. Remove the drawers. Retournez le cabinet à l'envers. Turn the cabinet upside down. Défoncez les débouchures (2) Punch out knock-outs (2) at dans le fond du caisson.
  • Page 4 Options under Cabinet LA30... continue Options sous un cabinet LA30... suite Ensemble de superposition LA78 Stacking Kit LA78 Remove the dividers from the top cabinet. Top Cabinet / Cabinet du haut Enlevez les diviseurs du cabinet du haut. Turn the cabinet upside down. Retournez le cabinet à...
  • Page 5 Recessed Base LA85 & options under... continue Base en retrait LA85 & option en dessous... suite Ensemble de patins niveleurs LA74 Levelling Glide Kit LA74 Tapping screw Vis taraudeuse 3D1618L2 Remove the dividers. Turn the cabinet upside down. Enlevez les diviseurs. 5/8"...
  • Page 6 Recessed Base LA87/88 & options under... continue Base en retrait LA87/88 & option en dessous... suite Levelling glide RA75 Patins niveleurs RA75 Kick-plate Cache-base Bottom view Vue dessous Punch out if required / Défoncez si requis Floor anchoring hardware kit LA77 Ensemble pour ancrage au sol LA77 ''A'' Knock-outs (2) for adjusting the levelling glides from the inside of the cabinet.
  • Page 7 Workstation and Cabinet Poste de travail et cabinet Assembly of legs and other Pour l'assemblage des pattes et options, refer to assembly autres options, se référer au guide guide W10, W11, W12 & W20. W10, W11, W12 & W20. 12 gage Steel Top with cross bars (WS10/12) All other top Tous les autres dessus Dessus en acier d’épaisseur 12 jauge avec traverses (WS10/12)
  • Page 8 Suspended Cabinet Cabinet suspendu with Attachment Bars RA70 avec équerre de fixation RA70 5/16-18 nylon locknut Écrou nylon 5/16-18 3S2003Z2 5/16-18 bolt Boulon 5/16-18 3L120202 Washer Rondelle 3Z022002 ¾" Drawers must be removed. Les tiroirs doivent être retirés. Laminated wood top. Ø...
  • Page 9 Ancrage mitoyen Gang Anchoring 5/16-18 nylon locknut Washer 5/16-18 bolt Écrou nylon 5/16-18 Rondelle Boulon 5/16-18 3S2003Z2 3L120202 3Z022002 8 per side 4 per side 4 per side par côté par côté par côté ¾" Repeat for holes at the back of the cabinets (if required).