T1
1TB
4
5
5
7
8
9
10
13
14
1000VA
4
5
5
7
8
9
10
13
14
Control
Terminals
DR1
R9
M1
125/350/400HP
Fuses
Input
Ground Lug
Cable
Entry
Input Power
Terminals
L1
L2
L3
Exhaust
CB1
800A
Allow 6"
between
enclosures
for cooling
Motor
M2
125/350/400HP
Terminals
T1
T2
T3
Motor
Ground Lug
Cable
Exit
CX1-25
WARNING
RISK OF FIRE OR ELECTRIC SHOCK-
The opening of the branch-circuit protective device may
be and indication that a fault current has been
interrupted. All current-carrying parts and other
components protected by this device should be
examined and replaced if damaged. If burnout of a
current element of an overload relay occurs, the
complete overload relay must be replaced.
CAUTION
VOLTAGE MAY BE PRESENT FROM MORE
THAN ONE SOURCE AND SHOULD BE
DISCONNECTED FOR SERVICING.
ATTENTION
PEUT ETRE SOUS TENSION DE PLUS D'UNE
SOURCE D'ALIMENT ELECTRIQUE. COUPER TOUTES LES
SOURCES D'ALIMENTATION AVANT LE DEPANNAGE.
Fan
!
WARNING
Wait at least 5 minutes after disconnecting
supply before continuing to work.
Consult the Installation & Start-Up Manual
before working on the frequency converter.
!
ATTENTION!
Attendre au moins 5 min apres sectionnement
de l'alimntation pour travailler sur l'appareil.
Consulter le Manuel d'installation et de mise
Circuit Breaker
end route avant d'intervenir sur le convertisseur
de frequence.
Disconnect
Circuit Breaker
OFF
DRIVE
BYPASS
Air Inlet
Fan
Exhaust
Disconnect
ACS580-0P with Bypass