Download Print this page
STEIN STE1218 Instruction Manual

STEIN STE1218 Instruction Manual

Lunar bath screen

Advertisement

Quick Links

LUNAR BATH SCREEN
INSTRUCTION MANUAL
PRODUCT CODE: LUNAR BATH SCREEN-STE1218
DEC 2020
IMPORTANT!
1.
When you receive your Lunar Bath Screen package please check for any freight damage.
2. If damage has occurred advise your supplier within 8 hours.
3. Do not install any faulty product as this will invalidate later claims.
1

Advertisement

loading
Need help?

Need help?

Do you have a question about the STE1218 and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for STEIN STE1218

  • Page 1 LUNAR BATH SCREEN INSTRUCTION MANUAL PRODUCT CODE: LUNAR BATH SCREEN-STE1218 DEC 2020 IMPORTANT! When you receive your Lunar Bath Screen package please check for any freight damage. 2. If damage has occurred advise your supplier within 8 hours. 3. Do not install any faulty product as this will invalidate later claims.
  • Page 2: Warranty

    LUNAR BATH SCREEN INSTALLATION INTRODUCT0RY Thank you for selecting a quality Stein Bathroomware Product. HEALTH AND SAFETY • The glass requires two people to handle. • Always stand glass up after unpacking the components and use soft packing when in contact with hard surfaces. Take care not to strike an edge or corner on a hard surface.
  • Page 3 EXPLODED VIEW AND COMPONENT LIST Fixed Glass Swinging Glass Door Door Channel Centre Seal Bottom Hinge Top Hinge Support Bar PAR3953 PAR5735 PAR8224 PAR8217 PAR8200 Screw Pack PAR8231 30mm Seal 15mm Seal Adhesive PAR2147 PAR2154 Deflector Seal Wall Plug Screw Screw Screw Screw...
  • Page 4: Installation

    INSTALLATION Flange to Seal 04 inside WALL CHANNEL ADJUSTMENT 1100mm (Minimum) to 1115 (Maximum) Fastening point for pivot hinge (screw) ST3.5*30 DIAGRAM 1 DIAGRAM 2 ST3.5*30 Fit parts to door. Component assembly door to fixed glass. Flange to inside ST3.5*30 Centre Seal ST3.5*30 ST3.5*30...
  • Page 5 INSTALLATION LOCATION OF WALL CHANNEL Do not install on top of bath lip. ST3.5*35 When it is a very low contour top lip, place this at a minimum of 25mm from edge. Standard position of bath screen 4mm inside bath lip (refer to D below).
  • Page 6 INSTALLATION 5 Pack under door establish a parallel gap preferably slightly greater at door end. Drill & fasten frame to wall channel on inside. 4x10mm Screw 6 Attach support bar. Assemble support arm on glass. Fasten to wall Fixed Glass Door Glass...
  • Page 7 36 hours 36 hours Allow 36 hours min. for silicone to cure before use. Allow 36 hours min. for silicone to cure before use. CONTACT Freephone: 0800 002 299 Phone: 07 928 9990 Email: info@stein.co.nz www.stein.co.nz...