If damage has occurred advise your supplier immediately and do not proceed with installation. DISCLAIMER Stein International Ltd are not liable for any Georgia Square shower unit that has not been installed correctly. GLASS WARRANTY CLAIMS Glass breakages on site are not replaced under warranty.
ASSEMBLY DIAGRAM PACKAGE CONTENTS Before commencing installation, please ensure you have the following components in your package to complete installation. Tick Ref Contents Qty. Door front assembly channel Fixed panel wall channel Fixed return panel Door front assembly Handle set Fixed panel screws 8mm Fixed panel screw caps Wall jamb fixing screws 35mm...
LAYOUT PLAN WALL WALL CHANNEL CHANNEL IMPORTANT: • A & B measurements are the minimum outer boundary line of glass channels. • Measurements are based on the floor being level, walls plumb and all surfaces flat. Any variations must be taken into account when marking out the position within the minimum to maximum range.
All tiling must be completed and allowed to cure before installing the shower enclosure. checked INSTALLATION OF GEORGIA SQUARE SHOWER - 2 SIDED Go to the Layout Plan on Page 3 and identify the shower type you are installing. Mark out the outside line positioning of the wall channels within the minimum to maximum range to suit your requirements.
Page 6
Slide Fixed Return Panel (3) and Door Assembly (4) into Wall Channel (1). Hint: Insert the top or bottom corner of the panel into the channel first. Then the rest of the panel will slide into the channel easier. DIAGRAM B: Slide the Fixed Return Panel (3) over the extrusion on to the Front Door Assembly (4) at the leading corner.
Page 7
Using the sliding rails within the Front Door Assembly adjust them (in or out) to have both the Fixed Return Panel and Front Door Panel positioned on the boundary line. They should be positioned evenly between both wall channels. Drill and fasten off the bottom rail on the inside (Diagram D1). Using a level ensure the front assembly and return panel are plumb vertically at the corner junction and drill and fasten the top rail (Diagram D2).
Page 8
Handle Assembly: Screw the threaded rod into the handle. Slide top post on to the the threaded rod, making sure the post is facing the right way. Put standard screw into cap base, then into washer, then into lower hole in the glass.
Page 9
113 Newton Street, Mount Maunganui Freephone 0800 002 299 Phone +64 7 928 9990 www.stein.co.nz...
Need help?
Do you have a question about the GEORGIA and is the answer not in the manual?
Questions and answers