Break-In Operation; Engine Speed Adjustment - Subaru EH09-2D Service Manual

Gasoline engine
Table of Contents

Advertisement

2-3-24 FUEL TANK
Attach fuel tank to fuel tank bracket.
Fix fuel tank with flange bolts.
M6 x 12 mm flange bolt : 4 pcs.
Tightening torque
6 - 8 N•m
(60 - 80 kgf•cm)
(4.3 - 5.7 ft•lb.)
Connect fuel hose with fuel cock and carburetor,
and secure with clamps.
- End of the reassembly -

2-4 BREAK-IN OPERATION

A new engine or an engine that has been completely overhauled by being fitted with a new
piston, rings, valves and connecting rod should be thoroughly RUN-IN before being put back
into service.
Good bearing surfaces and running clearances between the various parts can only be
established by operating the engine under reduced speed and loads for a short period of time.
While the engine is being tested, check for oil leaks.
Make final carburetor adjustment and regulate the engine operating speed.
Step
Step 1
Step 2
Step 3

2-5 ENGINE SPEED ADJUSTMENT

High-speed side ; Engine speed is varied by the equipment, so adjust the speed to the specified one
indicated on the equipment.
Low-speed side ; Adjust the engine speed to 1,400 rpm by the carburetor idle screw, and then adjust to
1,600 rpm by adjusting screw of governor base plate.
Load
No Load
No Load
No Load
– 35 –
M6 x 12 FLANGE BOLT : 4 pcs.
FUEL TANK
P.T.O. shaft side
CLAMP : 2 pcs.
To
CARBURETOR
FUEL PIPE : 1 pc.
Engine Speed
2,500 rpm
3,000 rpm
3,600 rpm
Time
10 min.
10 min.
10 min.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents