Page 2
Module Installation 1. Turn off all power to the unit. Make all necessary jumper selections. Position module in front of any desired module bay opening, making sure that the module is right-side up. Slide module on to card guide rails. Make sure that both the top and bottom guides are engaged.
Page 3
"+" terminal. Since unbalanced connections do not provide the same amount of noise immunity that a balanced connection does, the connection distances should be made as short as possible. 50 Spring Street, Ramsey, NJ 07446, U.S.A. GATE ENABLE/ DISABLE 201-934-8500; Fax: 201-934-9832 www.bogen.com ASSIGNMENT BUS A BUS B...
Need help?
Do you have a question about the TBL1S and is the answer not in the manual?
Questions and answers