Internal cable installation

Subrack alarm wiring

....................................................................................................................................................................................................................................
Routing (PDP side)
....................................................................................................................................................................................................................................
365-374-074
Issue a, April 2002
The following subrack alarm cables should be used:
Cables
CI-CTL - PDP, upper — CC848811527/DC1002828
CI-CTL - PDP, lower — CC848811535/DC1001829.
Important! These cables are mounted on the right rear stile of the
rack frame. Remove two or three transport tie-wraps to route these
cables to the subrack.
In the case of ...
an upper subrack
a lower subrack
Result
Figure 4-14 Routing of the subrack alarm cables (PDP side)
Lucent Technologies
System cabling and final assembly
Then ...
route the cable — CC848811527/
DC1002828 (item 2) at the right rear
side of the stile strip of the frame.
route the cable — CC848811535/
DC1001829 (item 1) at the right rear
side of the stile strip of the frame.
4 - 2 3