Lucent Technologies Lineage 2000 ECS Minicell Battery Plant Product Manual
Lucent Technologies Lineage 2000 ECS Minicell Battery Plant Product Manual

Lucent Technologies Lineage 2000 ECS Minicell Battery Plant Product Manual

Hide thumbs Also See for Lineage 2000 ECS Minicell Battery Plant:
Table of Contents

Advertisement

Quick Links

Product Manual
H569-420
Select Code 167-790-062
Comcode 107539926
Issue 5
February 1997
© Lucent Technologies 1997
All Rights Reserved
Printed in U.S.A.
600-Ampere, +24-Volt
ECS Minicell Battery Plant
Notice:
Every effort was made to ensure that the information in this
document was complete and accurate at the time of printing.
However, information is subject to change.
®
Lineage
2000

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Lineage 2000 ECS Minicell Battery Plant and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Lucent Technologies Lineage 2000 ECS Minicell Battery Plant

  • Page 1 ECS Minicell Battery Plant Notice: Every effort was made to ensure that the information in this document was complete and accurate at the time of printing. However, information is subject to change. © Lucent Technologies 1997 All Rights Reserved Printed in U.S.A.
  • Page 3: Table Of Contents

    Lucent Technologies ECS Minicell Battery Plant H569-420 Table of Contents 1 Introduction General 1 - 1 Application 1 - 1 Configurations 1 - 1 Basics 1 - 1 Technical Support 1 - 2 USA, Canada, Puerto Rico, and the US Virgin Islands 1 - 2...
  • Page 4 Lucent Technologies ECS Minicell Battery Plant H569-420 3 Engineering and Ordering Sizing a Plant 3 - 1 Non-Redundant Systems 3 - 1 Redundant Systems 3 - 1 Plant Sizing Example 3 - 2 Other Considerations 3 - 2 Ordering Information...
  • Page 5 Lucent Technologies ECS Minicell Battery Plant H569-420 Alarm Leads 6 - 5 AC Fittings 6 - 7 7 Maintenance Controls and Indicators 7 - 1 LVD/R LEDs 7 - 1 Fuses 7 - 1 DC Circuit Breakers 7 - 2...
  • Page 6 Lucent Technologies ECS Minicell Battery Plant H569-420 List of Figures ® Figure 1-1: +24V Lineage 2000 ECS Minicell Battery Plant (Model H569-420 Group 1) 1 - 4 ® Figure 1-2: +24V Lineage 2000 ECS Minicell Battery Plant (Model H569-420 G-2 E/W Group 10)
  • Page 7 Lucent Technologies ECS Minicell Battery Plant H569-420 2 - List of Figures Issue 5 February 1997...
  • Page 8 Lucent Technologies ECS Minicell Battery Plant H569-420 List of Tables Table 2-A: H569-420 Specifications 2 - 1 Table 3-A: +24V Minicell Battery Plant (H569-420) 3 - 4 Table 3-B: Recommended Spares 3 - 5 Table 3-C: Miscellaneous Parts 3 - 5...
  • Page 9 Lucent Technologies ECS Minicell Battery Plant H569-420 Table 5-C: Installation Reference Documents 5 - 5 Table 6-A: Controller Dip Switch Settings 6 - 1 Table 6-B: Controller Factory Default Settings 6 - 2 Table 6-C: CP2 Dip Switch Settings 6 - 3...
  • Page 10: Introduction

    Lucent Technologies ECS Minicell Battery Plant H569-420 Introduction General This product manual (Select Code 167-790-062) describes the H569-420 ECS Minicell Battery Plant, developed by Lucent Technologies to satisfy the growing needs of cellular service providers for a reliable mid-size, +24-volt battery plant.
  • Page 11: Technical Support

    Lucent Technologies ECS Minicell Battery Plant H569-420 The H569-420 plant houses the rectifiers, controller, distribution, and the battery in a single, compact frame. It offers a choice of racks that are mounted on a battery stand. The basic plant has charge and discharge bus bars with optional low...
  • Page 12: Usa, Canada, Puerto Rico, And The Us Virgin Islands

    Support/Regional Technical Assistance Center or contact your sales representative who will be happy to discuss your specific needs. Product Repair Repair and return service for Lucent Technologies equipment is available to customers around the world. and Return USA, Canada, For information on returning of products for repair, customers Puerto Rico, and may call 1-800-255-1402 for assistance.
  • Page 13 Lucent Technologies ECS Minicell Battery Plant H569-420 Output Distribution Panel (G-7 or G-8) ECS Controller (G-6) 364B2 +24V Rectifier +24VDC to –48VDC Converter Assembly (G-N) One String of +24V 600AH Batteries ® Figure 1-1: +24V Lineage 2000 ECS Minicell Battery Plant...
  • Page 14: Figure 1-2: +24V Lineage 2000 Ecs Minicell Battery Plant (Model H569-420 G-2 E/W Group 10)

    Lucent Technologies ECS Minicell Battery Plant H569-420 LINEAGE 2000 1 1 / 3 A 1 1 / 3 A 2A 1011 12 WARNING FAIL LVD/R OPEN Output F SPARE 13 14 15 16 17 18 19 20 21 FUSES 1 1 / 3 A...
  • Page 15 Lucent Technologies ECS Minicell Battery Plant H569-420 1 - 6 Introduction Issue 5 February 1997...
  • Page 16: Product Description

    Lucent Technologies ECS Minicell Battery Plant H569-420 Product Description Specifications Table 2-A: H569-420 Specifications 180-264 volts ac Input Voltage (208/220/240 volts ac nominal) 47-63 Hertz Input Frequency (50/60 hertz nominal) 20-30 volts dc Operating Voltage (24 volts dc nominal) 24-29 volts dc...
  • Page 17 Lucent Technologies ECS Minicell Battery Plant H569-420 Table 2-A: H569-420 Specifications Converter Shelf Assembly Type: PECO II (Note 2) Type: PECO II Converters Rating: 48V dc nominal, 4 amperes Maximum per shelf: 2 Type: C&D, Liberty 2000 Batteries (Group 1)
  • Page 18 Lucent Technologies ECS Minicell Battery Plant H569-420 Table 2-A: H569-420 Specifications 362 lbs (164kg) with 6 rectifiers 1797 lbs (815kg) with 6 rectifiers Weight Group 1 battery stand and 1 string of C&D batteries 337 lbs (153kg) with 6 rectifiers...
  • Page 19: Notes

    Lucent Technologies ECS Minicell Battery Plant H569-420 Notes 1. If a panel is expected to operate continuously in an ambient temperature of 40° C to 50° C, the total current draw through the panel cannot exceed 500 amperes. 2. The H569-420 Group 1 can accommodate 2 rectifier shelves and one converter shelf.
  • Page 20: Figure 2-1: Block Diagram Of Typical Battery Plant

    Lucent Technologies ECS Minicell Battery Plant H569-420 Rectifiers: convert an ac source voltage into the dc voltage level required to charge and float the batteries and to power the using equipment. Controller: provides the local and remote control, monitor and diagnostic functions required to administer the battery plant.
  • Page 21: Ecs Battery Plant Physical Description

    Lucent Technologies ECS Minicell Battery Plant H569-420 ECS Battery ® The H569-420 Lineage 2000 Evolutionary Control System (ECS) Battery Plant is shown in Figures 1-1 and 1-2. The ECS Plant Physical battery plant provides power for the using equipment as well as Description float and recharge capability for the battery reserve.
  • Page 22: Ecs Battery Plant Subsystems

    Lucent Technologies ECS Minicell Battery Plant H569-420 600 A DISCHARGE CHARGE SHUNT RETURN BUS RETURN BUS RECTIFIER RECTIFIER DISTRIBUTION BATTERY BATTERY STRING STRING BATTERY CHARGE TO OFFICE LOADS ALARMS OUTPUT VOLTS FLOAT LINEAGE 2000 TO OFFICE AMPS µP NORM ALARMS...
  • Page 23: Batteries

    Lucent Technologies ECS Minicell Battery Plant H569-420 without transformer tap changes. A power factor correction circuit incorporated in the design ensures a power factor of 90 percent or greater for loads above 50 percent of the full load rating. The rectifiers provide the ECS controller with a full complement of status and alarm signals.
  • Page 24: Dc Distribution

    Lucent Technologies ECS Minicell Battery Plant H569-420 datalogger board may be used in conjunction with the microcomputer option to provide general purpose ac and dc voltage and current monitoring and control. (See the ECS controller manual for further information.) DC Distribution The ECS dc distribution panel (H569-420 Group 7 or 8) has a maximum of 42 circuit breaker positions.
  • Page 25 Lucent Technologies ECS Minicell Battery Plant H569-420 amperes. The shunt millivolt signal is sent, via the CP5 Fuse Board, to the controller where it is translated to amperes and displayed on the digital meter. Low Voltage In unattended battery plant locations, especially those without...
  • Page 26: Figure 2-3: Ecs Distribution Bus Bars

    Lucent Technologies ECS Minicell Battery Plant H569-420 yellow LED on the controller front panel and sending Power Minor (PMN) alarms to the alarm reporting center. Figure 2-3: ECS Distribution Bus Bars Issue 5 February 1997 Product Description 2 - 11...
  • Page 27: Figure 2-4: Plug-In Circuit Breaker Mounting

    Lucent Technologies ECS Minicell Battery Plant H569-420 Figure 2-4: Plug-In Circuit Breaker Mounting 2 - 12 Product Description Issue 5 February 1997...
  • Page 28: Circuit Breakers

    Lucent Technologies ECS Minicell Battery Plant H569-420 Circuit Breakers The dc distribution panel (Figure 2-5) accommodates a maximum of 42 circuit breakers. The circuit breakers are plug-in style, KS-23616, and are available in 3, 5, 10, 15, 20, 30, 40, 45, 50, 60, 70, 80, 90 and 100 ampere ratings.
  • Page 29: Figure 2-5: Ecs Distribution Panel

    Lucent Technologies ECS Minicell Battery Plant H569-420 LINEAGE 2000 1 1 / 3 A 1 1 / 3 A 10 11 12 CAUTION FAIL WARNING FOR CONTINUED PROTECTION AGAINST RISK HAZARDOUS VOLTAGE/ENERGY LVD/R OF FIRE, REPLACE FUSES ON CIRCUIT BOARD INSIDE.
  • Page 30: Engineering And Ordering

    Lucent Technologies ECS Minicell Battery Plant H569-420 Engineering and Ordering Sizing a Plant When ordering a battery plant, the engineer must determine whether the plant is to be redundant or not. The following sections describe both non-redundant and redundant systems.
  • Page 31 Lucent Technologies ECS Minicell Battery Plant H569-420 other cases, additional rectifiers other than the redundant rectifier may be required to provide the battery recharge current. Plant Sizing The following example illustrates the relationship between mirc, Example abh current drains, the recharge factor, and battery recharge current.
  • Page 32: Ordering Information

    Lucent Technologies ECS Minicell Battery Plant H569-420 Figure 3-1: Recharge Time vs. Recharge Factor ® Ordering The +24V minicell Lineage 2000 ECS battery plant is ordered using the Group (G) numbers on the H569-420 drawing and has Information two main groups. Group 1 provides a 46-inch bay framework which is field-mounted on top of a battery stand and a string of C&D 600 ampere-hour batteries.
  • Page 33: Table 3-A: +24V Minicell Battery Plant (H569-420)

    Lucent Technologies ECS Minicell Battery Plant H569-420 Other groups on the H569-420 drawing are ordered as “Equipped With (E/W)” items. This means that they are ordered in addition to a main group and will be installed in the factory. If these groups are ordered as separate items, they will be shipped to you in separate containers to be assembled during installation.
  • Page 34: Table 3-B: Recommended Spares

    Lucent Technologies ECS Minicell Battery Plant H569-420 Table 3-A: +24V Minicell Battery Plant (H569-420) Group Description Number Optional equipment for plant controller in addition to Group 6 to provide a datalogger circuit pack (CP3). CP3 is a data acquisition circuit pack that always requires a CP2 (Group A or Group B).
  • Page 35: Table 3-D: Floor Plan And Heat Release Data

    Lucent Technologies ECS Minicell Battery Plant H569-420 2. Order rectifiers, fuses and fuse holders, circuit breakers, terminal lug kits, and certain X.25/TL1 equipment as separate items. Ordering tables follow appropriate notes. 3. Floor plan and heat release data are as follow:...
  • Page 36: Table 3-E: Low Voltage Disconnect Settings For Cp5 (Bcb4)

    Lucent Technologies ECS Minicell Battery Plant H569-420 26 Watts represents the heat release value for the ECS Controller equipped with the 113B2 control unit, CP2, and CP3. 144 Watts represents the heat release value for the converter shelf equipped with two converters.) 4.
  • Page 37: Table 3-F: Cable And Lug Sizes

    Lucent Technologies ECS Minicell Battery Plant H569-420 (All sizes are for 1/4” bolt.) Use “taps” for larger wire size requirements. Table 3-F: Cable and Lug Sizes Cable KS5482 L28FR 6 AWG WP91412 L-3 KS5482 L28FR 4 AWG WP91412 L-5 KS5482 L28FR 2 AWG...
  • Page 38: Table 3-I: Terminal Lug Kits For 60 - 100 Ampere

    Lucent Technologies ECS Minicell Battery Plant H569-420 Table 3-H: Terminal Lug Kits for 3 - 50 Ampere Circuit Breakers Wire Size Comcode Kit Contents (1) WP91412 L-102 Double Hole Term (1) WP91412 L-2 Single Hole Term 6 AWG 847301686 Blue (2) 10-32x7/16 Screw (2) WP91767 L-5 1/2 Tubing 2 in.
  • Page 39: Table 3-J: J85501D-2 Controller Default Settings

    Lucent Technologies ECS Minicell Battery Plant H569-420 Table 3-J: J85501D-2 Controller Default Settings Alarm Function Voltage Threshold Battery on Discharge (BD) +26.5 Volts High Voltage Float (HV) +28.25 Volts High Voltage (Equalize) +29.25 Volts (Disabled) Refer to J85501D-1 for other settings.
  • Page 40: Table 3-L: Circuit Breakers For Groups 7 And 8

    Lucent Technologies ECS Minicell Battery Plant H569-420 stand. The Group 1 plant accommodates up to two rectifier shelves as well as a converter shelf. A Group 2 plant can accommodate only one rectifier shelf (Group 4) if it is equipped with a converter shelf assembly (Group N).
  • Page 41: Table 3-M: Fuse Holder And Fuses For Groups 7 And 8

    Lucent Technologies ECS Minicell Battery Plant H569-420 * Circuit breakers rated between 60 and 100 amperes require two positions on the distribution panel. Two-position circuit breakers should only be installed in the top row (positions 12-21 and 32-41). Distribute 60 to 100 ampere circuit breakers on the panel.
  • Page 42: Table 3-O: Battery Stand And Batteries

    Lucent Technologies ECS Minicell Battery Plant H569-420 24. Group C includes CP3 circuit pack, a set of current limiting resistor assemblies, and a product manual. 25. Group D includes CP3 circuit pack, a remote termination panel with a cable set, a set of current limiting resistor assemblies, and a product manual.
  • Page 43: Sample Orders

    Lucent Technologies ECS Minicell Battery Plant H569-420 31. Order battery terminal plate assembly for Group 10 from the table below. Each battery string requires one battery terminal plate. Table 3-Q: Battery Terminal Plate Assembly Description Comcode Battery Terminal Plate Assembly 601372550 32.
  • Page 44: Documentation References

    Lucent Technologies ECS Minicell Battery Plant H569-420 The following sample order corresponds to Figure 1-2 in Section 1. This bay is a 42” top hat mounted on top of a VR battery stand. It has two rectifier shelves, an ECS controller, a distribution panel with low voltage disconnect.
  • Page 45: Controller

    Lucent Technologies ECS Minicell Battery Plant H569-420 Controller ECS Controller Assembly and Ordering Drawing J85501D-2 Wiring Diagram None Schematic Drawing SD82669-02 Product Manual Select Code 167-790-033 Optional Circuit Pack Product Manual 167-790-108 Select Code Rectifier and RSA SR Series 100A Rectifier and Rectifier Shelf Assembly...
  • Page 46: Safety

    Lucent Technologies ECS Minicell Battery Plant H569-420 Safety Safety Please read and follow all safety warnings before installing, ® maintaining, or repairing the +24V Lineage 2000 battery plant. Statements ® 1. The H569-420,+24V Minicell Lineage 2000 ECS Battery Plant, is to be used in controlled environments. Install only...
  • Page 47 Lucent Technologies ECS Minicell Battery Plant H569-420 6. The short circuit current capability of the battery input to the distribution panel should not exceed 7000 amperes. 7. Alarm contact on the distribution panel are not fused within the distribution panel. Therefore, current limiting protection for these contacts must be provided by external circuits.
  • Page 48: Warning Statements

    Lucent Technologies ECS Minicell Battery Plant H569-420 Warning Statements WARNING Hazardous voltage/energy inside. Risk of injury. This unit must be accessed only by qualified personnel. Explanation: This unit must be installed, serviced, and operated only by skilled and qualified personnel who have the necessary...
  • Page 49 Lucent Technologies ECS Minicell Battery Plant H569-420 The symbol below identifies the presence of rectifier and battery voltages. Explanation: Batteries may be connected in parallel with the rectifiers. Turning off the rectifiers will not necessarily remove power from the bus. Make sure the battery power is also disconnected.
  • Page 50: Installation

    Lucent Technologies ECS Minicell Battery Plant H569-420 Installation General Lucent Technologies offers complete engineering and installation service that result in “turnkey” plant operation. Contact your Lucent Energy Systems Account Executive for further information on the complete range of installation services available from Lucent. Customers may, however, choose to install the battery plant based upon the information supplied here.
  • Page 51: Suggested Installation Sequence

    Lucent Technologies ECS Minicell Battery Plant H569-420 • Equipment to handle shipping containers, remove framework from shipping containers, and erect framework into final position. Minimum lifting capacity: 500 lbs • Common electrician's hand tools • Proper crimping tools and dies for connectors used •...
  • Page 52: Unpacking, Handling, And Frame Installation

    Lucent Technologies ECS Minicell Battery Plant H569-420 6. All bolts making electrical connections should be torqued per the values in Table 5-A; all bolts for mechanical connections should be torqued per values in Table 5-B. Installation Table 5-C lists the drawings, manuals and other documentation that are necessary to complete the following Sequence of Tasks.
  • Page 53: Table 5-A: Minimum Torque For All Electrical

    Lucent Technologies ECS Minicell Battery Plant H569-420 Table 5-A: Minimum Torque for All Electrical Connections Torque - lb-in or lb-ft Wire Connections Head Tightened Nut Tightened Screw Size Slotted Hex or Slotted Hex or Slotted Hex or Machine Socket Cap...
  • Page 54: Cable Support And Ground System

    Lucent Technologies ECS Minicell Battery Plant H569-420 Table 5-B: Torque and Minimum Yield Strength for Mechanical Connections using Hex Head Cap Screws Minimum Yield Strength Torque (ft-lb) Cap Screw Diameter (PSI) UNRC 57,000 3/16 57,000 57,000 7/16 57,000 57,000 9/16...
  • Page 55 Lucent Technologies ECS Minicell Battery Plant H569-420 Cable Support Hang all cable support systems, as well as any auxiliary ground and Ground bus bars, as dictated by the job application drawings. System Controller and Follow the controller setup procedure given in the Controller LVD Setup manual to complete the steps below.
  • Page 56 Lucent Technologies ECS Minicell Battery Plant H569-420 Note It is recommended that ac be wired during the initial installation for all rectifier positions that may be used in the future. If ac is prewired in this way, growth in rectifier capacity is as simple as plugging in an additional rectifier.
  • Page 57: Load Wiring

    Lucent Technologies ECS Minicell Battery Plant H569-420 DANGER Battery voltage is present behind the distribution cover. Remove all jewelry before working in this area. Use insulated tools only. Load Wiring Open the dc distribution cover panel by turning the two 1/4 turn fasteners located on the front of the panel.
  • Page 58: Turn-Up

    Lucent Technologies ECS Minicell Battery Plant H569-420 2. Test Enable/disable rectifier restart feature. 3. Test HV shutdown level(s). 4. Test BD alarm levels. 5. Test other optional circuit packs. Turn-up Turn on and adjust all rectifiers for normal operation according to the Rectifier manual.
  • Page 59: Figure 5-2: Floor Mounting Hole Pattern For Group 1 Battery Stand

    Lucent Technologies ECS Minicell Battery Plant H569-420 Figure 5-2: Floor Mounting Hole Pattern for Group 1 Battery Stand 5 - 10 Installation Issue 5 February 1997...
  • Page 60: Figure 5-3: Floor Mounting Hole Pattern For Group 10 Battery Stand

    Lucent Technologies ECS Minicell Battery Plant H569-420 Figure 5-3: Floor Mounting Hole Pattern for Group 10 Battery Stand Figure 5-4: LVD/Fuse Board (CP5) Jumper Locations Issue 5 February 1997 Installation 5 - 11...
  • Page 61: Installation Procedures For Plant Growth

    Lucent Technologies ECS Minicell Battery Plant H569-420 Installation As your power needs evolve, equipment may be easily added to the battery plant to provide any of the following. Procedures for Plant Growth • Expanded controller features • Additional rectifier capacity •...
  • Page 62 Lucent Technologies ECS Minicell Battery Plant H569-420 Caution Accidentally or intentionally turning a circuit breaker off may affect service to load equipment. Take care not to disturb load-carrying circuits. 4. Locate the intended new breaker position. Spare circuit breakers may or may not already be in place on the dc distribution panel, as ordered.
  • Page 63 Lucent Technologies ECS Minicell Battery Plant H569-420 current and does not necessarily indicate a fault condition. Attempt to close the circuit breaker a second time. If the breaker trips again, check the wiring to the load circuit. 5 - 14 Installation...
  • Page 64: Installation Tables

    Lucent Technologies ECS Minicell Battery Plant H569-420 Installation Tables The tables below provide additional information. Many of them appear in other manuals and are duplicated here for your convenience. In them, a “0” indicates an open switch setting and a “1” indicates a closed switch setting.
  • Page 65: Table 6-B: Controller Factory Default Settings

    Lucent Technologies ECS Minicell Battery Plant H569-420 Table 6-B: Controller Factory Default Settings Jumper Settings Jumper Board Header Function Pins P602.1 1 & 2 P602.2 1 & 2 Backplane +24 Volts 846575280 P602.3 1 & 2 P602.4 1 & 2 P105 1 &...
  • Page 66: Rectifier

    Lucent Technologies ECS Minicell Battery Plant H569-420 Table 6-C: CP2 Dip Switch Settings SW20 Function Option Switch Setting Enabled Remote TR Disabled Shunt Size 600 amperes Reserved Maximum # of 6 Rectifiers rectifiers Nominal Battery +24 Volts Plant Voltage Terminal...
  • Page 67: Wiring Diagram T-83260-30

    Lucent Technologies ECS Minicell Battery Plant H569-420 Wiring Diagram Table 6-E: Figure/Feature Cross-Reference T-83260-30 T83260-30 H569-420 Figure Feature Figure Group # Option 1, H9 LVD/Fuse Board (CP5) BCB4 - 2, B, H1, 600 Ampere Output H2, HA, Distribution Panel E/W Low...
  • Page 68: Alarm Leads

    Lucent Technologies ECS Minicell Battery Plant H569-420 Alarm Leads Table 6-F: T83260-30 Figure H3 Alarm Lead Designation Terminal Block-Pin Lead Meaning Designation 101-8 Alarm Battery Supply 102-7 ACFE C AC Fail External; alarm causes closure. 102-8 ACFE R AC Fail External; return...
  • Page 69 Lucent Technologies ECS Minicell Battery Plant H569-420 Table 6-F: T83260-30 Figure H3 Alarm Lead Designation Terminal Block-Pin Lead Meaning Designation Power Minor External; alarm causes 103-4 PMNE C closure 103-5 PMNE R Power Minor External; return. 103-6 PMNE O Power Minor External; alarm causes open Power Minor Audible;...
  • Page 70: Ac Fittings

    Lucent Technologies ECS Minicell Battery Plant H569-420 Table 6-F: T83260-30 Figure H3 Alarm Lead Designation Terminal Block-Pin Lead Meaning Designation 101-9 101-10 Transfer Shutdown from Engine 101-11 101-12 AC Fittings Table 6-G: Recommended AC Fittings Fitting Cable Type 1/2” Cable 3/4”...
  • Page 71 Lucent Technologies ECS Minicell Battery Plant H569-420 6 - 8 Installation Tables Issue 5 February 1997...
  • Page 72: Maintenance

    Lucent Technologies ECS Minicell Battery Plant H569-420 Maintenance Controls and Operating controls and indicators on the battery plant are listed below. Indicators • Controller LEDs and switches (see Controller Manual) • Rectifier LEDs and switches (see Rectifier Manual) • LVD/Fuse Board LEDs and fuses...
  • Page 73: Dc Circuit Breakers

    Lucent Technologies ECS Minicell Battery Plant H569-420 DC Circuit Circuit breakers CB1 through CB42 are located in the DC Breakers distribution. Any circuit breaker in the battery plant is ON (or closed) when the handle is in the Up position, and OFF (or open) in the Down position.
  • Page 74: Figure 7-1: Fuse Designation And Function

    Lucent Technologies ECS Minicell Battery Plant H569-420 Figure 7-1: Fuse Designation and Function for LVD/Fuse Board (CP5) Open A distribution breaker which should be closed may be in the Distribution open position for one of three reasons. Breaker 1. A distribution breaker may have been inadvertently turned off manually.
  • Page 75 Lucent Technologies ECS Minicell Battery Plant H569-420 Red LVD OPEN The Red LVD OPEN LED indicates that the LVD Contactor is LED Lit de-energized, i.e., open. The contactor may be open due to one of four reasons: 1. Plant voltage is below the disconnect threshold.
  • Page 76: Repair And Replacement

    Lucent Technologies ECS Minicell Battery Plant H569-420 Repair and Replacement Note Procedures in this section may cause power alarms to be issued temporarily. Notify the alarm reporting center before starting any repair procedure. Load Circuit Obtain a replacement circuit breaker. See Section 8.
  • Page 77: Lvd/R Contactor Replacement

    Lucent Technologies ECS Minicell Battery Plant H569-420 Warning Before applying power to any individual load, follow the turn up instructions provided in the associated load equipment documentation. 8. Turn on the load circuit breaker. If the circuit breaker trips immediately when turned on, this may be due to inrush current and does not necessarily indicate a fault condition.
  • Page 78: Lvd/Fuse Board (Cp5) Replacement

    Lucent Technologies ECS Minicell Battery Plant H569-420 3. Disconnect and label the 5 quick connects from the contactor coil and auxiliary switch. 4. Unbolt and remove contactor. 5. Reconnect quick connect leads to the new contactor (406545442 JFA-4011B Contactor) and then mount the contactor using the hardware from Step 4.
  • Page 79 Lucent Technologies ECS Minicell Battery Plant H569-420 • P502 to J502 • P506 to J506 • P501 to J501 • P504 to J504 • TB501 7. Close distribution panel. 7 - 8 Maintenance Issue 5 February 1997...
  • Page 80: Spares

    Lucent Technologies ECS Minicell Battery Plant H569-420 Spares Spare parts and miscellaneous equipment are listed below as well as in a separate section. Order 1 each of the following on a per office basis. Table 8-A: Recommended Spares Quantity Description...
  • Page 81 Lucent Technologies ECS Minicell Battery Plant H569-420 8 - 2 Spares Issue 5 February 1997...
  • Page 82: Product Warranty

    Lucent Technologies ECS Minicell Battery Plant H569-420 Product Warranty A. Seller warrants to Customer only, that: 1. As of the date title to Products passes, Seller will have the right to sell, transfer, and assign such Products and the title conveyed by Seller shall be good;...
  • Page 83 Lucent Technologies ECS Minicell Battery Plant H569-420 Warranty Period Repaired Product Product Type New Product or Part* Central Office 24 Months 6 Months Power Equipment** * The Warranty Period for a repaired Product or part thereof is as listed or, in the case of Products under Warranty, is the period listed or the unexpired term of the new Product Warranty Period, whichever is longer.
  • Page 84 Lucent Technologies ECS Minicell Battery Plant H569-420 Products accessible for repair or replacement and to restore the site. Products returned for repair or replacement will be accepted by Seller only in accordance with its instructions and procedures for such returns. The transportation expense associated with returning such Product to Seller shall be borne by Customer.
  • Page 85 Lucent Technologies ECS Minicell Battery Plant H569-420 9 - 4 Product Warranty Issue 5 February 1997...
  • Page 86: Glossary

    Lucent Technologies ECS Minicell Battery Plant H569-420 Glossary Ampere Hour Ampere hour is a rating for batteries that specifies duration of a (Amphour, AH) discharge for a given load. It is a convention for expressing “drain (or load) current” multiplied by time.
  • Page 87 Lucent Technologies ECS Minicell Battery Plant H569-420 High voltage National Electric Code RTAC Regional Technical Assistance Center (1-800-CAL-RTAC) 10 - 2 Glossary Issue 5 February 1997...

This manual is also suitable for:

H569-420H569-420 g-2 e/w

Table of Contents