Final Installation Checklist - Hamilton Beach OG02 Assembly And Operation Manual

Table of Contents

Advertisement

Available languages

Available languages

POST-ASSEMBLY

FINAL INSTALLATION CHECKLIST

• Ensure that the grill is properly assembled.
• Inspect the natural gas supply hose for burns, chaffing, kinks, and proper routing before each
use. If it is evident there is excessive abrasion or wear, or the hose is cut, it must be replaced
prior to the grill being used.
• Leak-check all gas connections and hose.
• All internal packaging is removed.
• Burners are sitting properly on orifices.
• Knobs turn freely.
• Properly place the empty grease tray onto grease tray brackets to catch grease during use.
• User informed of gas supply shut-off valve location.
• At least 36" from such construction to the sides and back of the grill, and that the grill shall not
be used under overhead combustible construction.
• Keep any fuel supply hose away from any heated surfaces. Hose should be at least 3 inches
from hot surfaces.
• There is no unprotected combustible construction material over the grill.
• Do not obstruct the flow of combustion and ventilation air.
32
C
A
B

Advertisement

Table of Contents
loading

Table of Contents