Download Print this page

Advertisement

Quick Links

PostMount 2-A for XL Panels
Installation Guide
Code-Compliant Planning and Installation Guide V1.1
Complying with AS/NZS1170.2:2011 ADMT 4-2016

Advertisement

loading
Need help?

Need help?

Do you have a question about the PV-ezRack PostMount 2-A for XL Panels and is the answer not in the manual?

Questions and answers

Summary of Contents for Clenergy PV-ezRack PostMount 2-A for XL Panels

  • Page 1 PostMount 2-A for XL Panels Installation Guide Code-Compliant Planning and Installation Guide V1.1 Complying with AS/NZS1170.2:2011 ADMT 4-2016...
  • Page 2: Table Of Contents

    (10°~60°). Using high the latest version of the installation manual by quality engineered components PostMount 2-A contacting Clenergy via email on www.clenergy. for XL Panels saves developers and installers, com.cn.or contacting your local distributor. time and money when delivering large scale projects.
  • Page 3: Tools & Components

    Rectangular Tube- Masterx1 Landscapex2 EZ-GL-ST Grounding Lugx4 Installation Guide_PostMount 2-A for XL Panels_AU_V1.1 (January 2021) page of 15 Unit 1, 10 Duerdin St, Clayton VIC 3168, Australia Tel: +61 3 9239 8088 Fax: +61 3 9239 8024 E-mail: tech@clenergy.com.au www.clenergy.com.au...
  • Page 4: System Overview

    Installation Guide_PostMount 2-A for XL Panels_AU_V1.1 (January 2021) page of 15 Unit 1, 10 Duerdin St, Clayton VIC 3168, Australia Tel: +61 3 9239 8088 Fax: +61 3 9239 8024 E-mail: tech@clenergy.com.au www.clenergy.com.au...
  • Page 5 (2) Apply lubricant (grease or 40# engine oil) to fasteners prior to tightening to avoid galling or seizing in the threads. Installation Guide_PostMount 2-A for XL Panels_AU_V1.1 (January 2021) page of 15 Unit 1, 10 Duerdin St, Clayton VIC 3168, Australia Tel: +61 3 9239 8088 Fax: +61 3 9239 8024 E-mail: tech@clenergy.com.au www.clenergy.com.au...
  • Page 6 Please refer to safe torques defined in this guide as shown in the figure below. If power tools are required, Clenergy recommends the use of low speed only. High speed and impact drivers increase the risk of bolt galling (deadlock). If deadlock occurs and you need to cut fasteners, please make sure that there is no load on the fastener before you cut it.
  • Page 7: Installation Instruction

    2. Keep all the Bolt head aligned. Installation Guide_PostMount 2-A for XL Panels_AU_V1.1 (January 2021) page of 15 Unit 1, 10 Duerdin St, Clayton VIC 3168, Australia Tel: +61 3 9239 8088 Fax: +61 3 9239 8024 E-mail: tech@clenergy.com.au www.clenergy.com.au...
  • Page 8 2: Using the adjustable washer to avoid the gap between the Rectangular Tube-Master and the Adjustable Tube. Unreliable connection is forbidden. Installation Guide_PostMount 2-A for XL Panels_AU_V1.1 (January 2021) page of 15 Unit 1, 10 Duerdin St, Clayton VIC 3168, Australia Tel: +61 3 9239 8088 Fax: +61 3 9239 8024 E-mail: tech@clenergy.com.au www.clenergy.com.au...
  • Page 9 Installation Guide_PostMount 2-A for XL Panels_AU_V1.1 (January 2021) page of 15 Unit 1, 10 Duerdin St, Clayton VIC 3168, Australia Tel: +61 3 9239 8088 Fax: +61 3 9239 8024 E-mail: tech@clenergy.com.au www.clenergy.com.au...
  • Page 10 Recommended torque for M8 bolts is 18~20 N·m Installation Guide_PostMount 2-A for XL Panels_AU_V1.1 (January 2021) page of 15 Unit 1, 10 Duerdin St, Clayton VIC 3168, Australia Tel: +61 3 9239 8088 Fax: +61 3 9239 8024 E-mail: tech@clenergy.com.au www.clenergy.com.au...
  • Page 11 5~6 N.m and the bolt M8*25 with 16~20 N.m .Copper Pipe will be supplied for the case that using small size Copper Wire. Installation Guide_PostMount 2-A for XL Panels_AU_V1.1 (January 2021) page of 15 Unit 1, 10 Duerdin St, Clayton VIC 3168, Australia Tel: +61 3 9239 8088 Fax: +61 3 9239 8024 E-mail: tech@clenergy.com.au www.clenergy.com.au...
  • Page 12 Rail as shown in the figure on the right. Installation Guide_PostMount 2-A for XL Panels_AU_V1.1 (January 2021) page of 15 Unit 1, 10 Duerdin St, Clayton VIC 3168, Australia Tel: +61 3 9239 8088 Fax: +61 3 9239 8024 E-mail: tech@clenergy.com.au www.clenergy.com.au...
  • Page 13: Certification Letter

    Certification Letter Installation Guide_PostMount 2-A for XL Panels_AU_V1.1 (January 2021) page of 15 Unit 1, 10 Duerdin St, Clayton VIC 3168, Australia Tel: +61 3 9239 8088 Fax: +61 3 9239 8024 E-mail: tech@clenergy.com.au www.clenergy.com.au...
  • Page 14 Australian and NZ Building Regulations, have carried out a structural design check of the PV- ezRack Postmount PM2-A/2100 within Australia. The design check has been based on the information in the PV-ezRack PM2-A/2100 Planning and Installation Guide and schematic drawings of the system components, provided by Clenergy Australia. Part number Description...
  • Page 15 REF: CL-10127-S Internal REF: 00140 Max Solar Panel Length 2.1m, width 1.1m; • Yield Strength: • Steel 300 MPa,  Aluminium 240 MPa;  Maximum tilt angle options: refer to tables; • Dimension as shown here on the picture; •...
  • Page 16 2. Panel weight calculated: 28kg 3. Solar Panels structural check by others. 4. Other piers dimensions are possible, contact Clenergy, if required. 5. For concrete pier foundations, use 25Mpa strength concrete (minimum). 6. The scope of this certification is for projects located at a maximum altitude of 100m above sea level.
  • Page 17 A soil report assessment is always recommended and Clenergy must be informed on the outcome of the soil report. Construction is to be carried out strictly on accordance with the instruction manual. This work was designed in accordance with the provisions of Australian Building Regulations and in accordance with sound, widely accepted engineering principles.
  • Page 18 @ClenergyClub @ClenergyAUS @Clenergy @ClenergyClub @Clenergy_global www.clenergy.com.au Clenergy Australia Add: Level 1, Suite 1, 10 Duerdin Street Clayton, VIC 3168 | 03 9239 8088 | warranty@clenergy.com.au Offices: Australia | China | Japan | Germany | Thailand | Philippines Installation Guide_PostMount 2-A for XL Panels_AU_V1.1 (January 2021)
  • Page 19 Details are provided below as to the extent of your Warranty coverage and any exclusions that may apply. Please read these provisions carefully to ensure you receive the appropriate assistance and support in a timely manner. Please also contact Clenergy Australia if any part of this Warranty is unclear, or you wish to discuss your rights and remedies under this Warranty.
  • Page 20 The benefits given by this Warranty are in addition to any statutory rights and remedies you may have under Australian law. Product Care: Clenergy Products are designed to be durable with minimal care, however it is important that you maintain your mounting Product in accordance with proper practices. This includes regular maintenance and inspection to avoid damage.
  • Page 21: Warranty

    Tel: +61 3 9239 8088 Fax: +61 3 9239 8024 Road, Chomphon Sub-district, Chatuchak District, Bangkok 10900 E-mail: sales@clenergy.com.au Tel: +66 (0) 2 277 5201, +66 (0) 6 3228-0200 www.clenergy.com.au E-mail: sales_th@clenergy.com, support_th@clenergy.com www.clenergythailand.com Clenergy China Clenergy Singapore 999-1009 Min’an Rd, Huoju Hi-tech Ind. Dev. Zone Xiang’an District 361101, Xiamen, Fujian, China...

This manual is also suitable for:

Pv-ezrack postmount 2-a