Crane BARNES SE51HT Series Installation And Operation Manual

Submersible sewage ejector
Hide thumbs Also See for BARNES SE51HT Series:

Advertisement

Quick Links

INSTALLATION and OPERATION MANUAL
Submersible Sewage Ejector
IMPORTANT!
Read all instructions in this manual before operating pump.
As a result of Crane Pumps & Systems, Inc., constant product improvement program,
product changes may occur. As such Crane Pumps & Systems reserves the right to
change product without prior written notifi cation.
A Crane Co. Company
420 Third Street
Piqua, Ohio 45356
Phone: (937) 778-8947
Fax: (937) 773-7157
www.cranepumps.com
Manual Index
BARNES
BARNES
Series: SE51HT
.5HP, 1750RPM, 60 Hz.
Single Seal (High Temperature)
83 West Drive, Bramton
Ontario, Canada L6T 2J6
Phone: (905) 457-6223
Fax: (905) 457-2650
®
Form No. 111124-Rev. L

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the BARNES SE51HT Series and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Crane BARNES SE51HT Series

  • Page 1 Read all instructions in this manual before operating pump. As a result of Crane Pumps & Systems, Inc., constant product improvement program, product changes may occur. As such Crane Pumps & Systems reserves the right to change product without prior written notifi cation.
  • Page 2: Table Of Contents

    PRESSURE GAUGE KIT (see parts list) Other brand and product names are trademarks or registered trademarks of their respective holders. ® Barnes is a registered trademark of Crane Pumps & Systems, Inc 2001, 2002, 5/04, 9/05, 5/06, 9/06 Alteration Rights Reserved.
  • Page 3: Safety First

    WARNING! - DO NOT pump hazardous materials IMPORTANT! - Crane Pumps & Systems, Inc. is not (fl ammable, caustic, etc.) unless the pump is specifi cally responsible for losses, injury, or death resulting from a designed and designated to handle them.
  • Page 4: Pump Specifications

    SECTION: A - PUMP SPECIFICATIONS: DISCHARGE ....2” NPT, Vertical, Bolt-on Flange UPPER BEARING: LIQUID TEMP ....200°F (93°C) Intermittent Design ..Single Row, Ball, Oil Lubricated MOTOR HOUSING ..Cast Iron ASTM A-48, Class 30 Load ..... Radial VOLUTE ......Cast Iron ASTM A-48, Class 30 LOWER BEARING: SEAL PLATE ....
  • Page 5: General Information

    For the location of the nearest Barnes Service Center, check in the project specifi cations. The moveable portion of the Break your Barnes representative or Crane Pumps & Systems, Inc., Away Fitting (BAF), check valve, piping and guide bracket Service Department in Piqua, Ohio, telephone (937) 778-8947 comes assembled on the pump along with the lifting cord.
  • Page 6 120 Volt 1 Phase Automatic Manual FIGURE 3 Automatic - Plug fl oat cord into outlet, then plug pump cord into fl oat cord. Manual - Plug pump cord directly int outlet. C-4) Electrical Connections: An acceptable motor control switch shall be provided at the time of installation.
  • Page 7: Electrical Data

    MODEL NO HP VOLT/PH Hz RPM NEMA FULL LOCKED CORD CORD CORD WINDING RESISTANCE (Nom) START LOAD ROTOR SIZE TYPE Franklin G.E. CODE AMPS AMPS inch (mm) Main-Start Main-Start SE51HT 120/1 1750 17.0 63.8 14/3 0.530 Winding Resistance ± 5%, measured from terminal block Pump Rated for Operation at ±...
  • Page 8 4.) If oil is found to be dirty or contaminated (or measures F-1.4) Replacing Oil: below 15 KV. breakdown), the pump must be Motor Housing- Set unit upright and refi ll with new cooling carefully inspected for leaks at the shaft seal (28), cord oil as per Table 1 (see parts list for amount).
  • Page 9 F-2.2) Reassembly: F-3.2) Reassembly: To install impeller (33), clean the threads with thread locking compound cleaner. Apply removable Loctite® 603 IMPORTANT! or equivalent to shaft threads. Screw impeller onto the shaft Do Not Hammer On The Seal hand tight while using a screwdriver in the slot at the end of Pusher-it Will Damage The Seal Face.
  • Page 10 Be sure to leave slack on the motor leads connected F-4.2) Reassembly: underneath. Use needle nose pliers to pull each female Bearings - When replacing bearing, be careful not to connector off of the pins on the underside of the terminal damage the rotor or shaft threads.
  • Page 11: Replacement Parts

    FIGURE 13 of housing. F-4.4) Cable Assemblies: Power Cord - Refi ll the cooling oil as outlined in paragraph F-1.3. Make wire connections as outlined in paragraph F-4.3. Insert female end of cable plug into housing bore aligning timing mark with hole in terminal block (21) see Figure 14. Compress cable plug with compression fl...
  • Page 12: Trouble Shooting

    TROUBLE SHOOTING CAUTION ! Always disconnect the pump from the electrical power source before handling. If the system fails to operate properly, carefully read instructions and perform maintenance recommendations. If operating problems persist, the following chart may be of assistance in identifying and correcting them: MATCH “CAUSE”...
  • Page 13: Cross-Section (Fig. 15)

    SE-HT (High Temp) Series, Single Seal FIGURE 15...
  • Page 14: Exploded View (Fig. 16)

    SE-HT (High Temp) Series, Single Seal FIGURE 16...
  • Page 15: Parts List

    PARTS KITS Seal Repair Kits: Single Seal ....P/N - 107272 (†) 2, 27,28, 36 Seal Tool Kit ....P/N - 107271 Pressure Gauge Kit ..P/N - 085343 PARTS LIST ITEM QTY. PART NO. DESCRIPTION 055400 Volute (Std) 071114 Volute (For use with Optional Strainer) 069140 Gasket 026210...
  • Page 16: Warrant

    Limited 24 Month Warranty Crane Pumps & Systems warrants that products of our manufacture will be free of defects in material and workmanship under normal use and service for twenty-four (24) months after manufacture date, when installed and maintained in accordance with our instructions.This warranty gives you specifi c legal rights, and there may also be other rights which vary from state to state.
  • Page 17: Returned Goods Policy

    Crane Pumps & Systems, Inc. Distributor. RETURNED GOODS RETURN OF MERCHANDISE REQUIRES A “RETURNED GOODS AUTHORIZATION”. CONTACT YOUR LOCAL CRANE PUMPS & SYSTEMS, INC. DISTRIBUTOR. Products Returned Must Be Cleaned, Sanitized, Or Decontaminated As Necessary Prior To Shipment, To Insure That Employees Will Not Be Exposed To Health Hazards In Handling Said Material.
  • Page 18 Notes...

Table of Contents