Reception; Installation - Tecfluid AD Series Instruction Manual

Flow switch and indicator
Table of Contents

Advertisement

3

RECEPTION

The series AD flowmeters are supplied conveniently packaged for their protection during
transportation and storage, together with their instructions manual for installation and
operation.
The instruments are supplied tested in our calibration rigs, ready for installation and service.
Before installing the flowmeter, remove all the blocking elements.
For models ADI, with the instrument in its working position, move the disc and check that
the indicating needle moves all over the scale and returns to zero.
4

INSTALLATION

If the flow switch model is AD15, it should be installed in a pipe so that the arrow on the label
points towards the fluid direction.
If it is an ADI15 model, the flow direction should coincide with that indicated on the scale.
The four possible positions are:
7

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ad15Adi15

Table of Contents