Operating Basics; Switching On The Cyflow Space - Partec CyFlow space Instrument Operating Manual

Table of Contents

Advertisement

Operating Basics

Operating Basics
Switching on the CyFlow
Notes
As sheath fluid you may
use
optimized
Partec
Sheath Fluid or prepare it
yourself.
To prepare sheath fluid,
fill destilled water into a
glass
bottle
or
Erlenmeyer flask (refer
to
Application
Note:
"Sheath
fluid
pre-
paration"),
through
small size filter mesh
(< 0.2 µm). Degas the
water by connecting it to
vacuum (e.g. a water jet
pump). Place the bottle
onto a heated stirrer for
about 15 minutes:
Remember: The smaller
the
particles
in
your
analysis are, the more
critical clean sheath fluid
becomes!
It is recommended to
replace the sheath fluid
at least once a week or
before any daily use.
For information how to
work
with
Windows®
please
consult
manual
"Introducing
Microsoft Windows" or
books available in your
local book shop.
Rev. 007 Date 2010-01-13
®
space
an
a
the
1. Check SHEATH and WASTE bottle
Make sure SHEATH bottle is filled with no more than
1600 ml of Sheath Fluid and is closed tightly with the
screw top. Tilt sheath bottle in order to release air
bubbles trapped in the yellow in-line filter!
Make sure the WASTE bottle is empty.
2. Switch on the instrument
®
The CyFlow
space Flow Cytometer is operated with 100
- 240 V AC.
Switch on main power at the left side of the instrument.
The 488nm laser has its own power button closeby,
please also switch on the 488 nm laser.
All other lasers are software controlled (for details please
refer to next page)
3. Control of the 488nm laser output power (for 200
mW high power laser only)
The 200 mW high power laser can be adjusted in its
operation power between 50 and 200 mW. For power
selection please doubleclick the icon shown on the left
(488-200)
To change selected laser power please type in:
enter
p=value
To inquire about actual selected laser power type in:
enter
?p
3. Switch on peripheral devices
Switch on printer.
4. Switch on computer
Finally, switch on computer by Computer Power switch.
After some ten seconds, the display shows the
Windows® desktop.
5. Start instrument operating software
Move mouse pointer (arrow on display) onto FloMax
other instrument control program icon.
Doubleclick on the icon with left mouse button.
- after a few seconds, the display shows the FloMax
Welcome window. By confirming with "OK" the CyFlow
space is initialized and the last used instrument settings
are loaded.
The display shows empty histograms.
6. Cleaning
Use speed 4. Run 1.6 ml Partec Cleaning Solution until
sample tube is empty. Activate CLEAN. Run a second
tube with Partec Sheath Fluid for 2 minutes.
®
Now, the CyFlow
space is ready for acquisition.
®
CyFlow
space Instrument Operating Manual
®
or
®
®
5/26

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents