Air trap sightglass cover
Hide thumbs Also See for ÄKTAprocess:

Advertisement

28-9266-70 AA
Assembly mount procedure – 6 mm and 1/2 inch air traps
1
Disconnect the air trap and remove the bottom nuts
Remove the TC coupling (A) and evacuation hose from the
top valve.
Unscrew and disconnect the cable contacts (B) from the
level sensors.
Disconnect the air trap inlet and outlet from the system
valves.
Loosen and remove four bottom nuts (E) and washers from
the connecting rods that are fixed to the support (D).
Note: The nut on the fifth connecting rod does not need to be
removed.
Note: The washers from the two front connecting rods will not
be used when the cover is mounted.
Lift the air trap from the support (D) and move it to a
suitable place to mount the cover assembly.
2
Pull out the connecting rods
Remove the bottom nuts (C) from the two front connecting
rods.
Pull the connecting rods (F) out of the air trap. Remove the
washers from the rods.
Note: Do not remove the dome nuts. Ensure that the dome nuts
still are securely fastened. If loose, the nuts should be
fastened and locked into place using Loctite™ 243.
3
Mount the top sightglass cover part
Place the top cover (G) on the air trap, with the opening
aligned with the sight glass.
Re-insert the front two connecting rods (F) through the top
holes in the cover.
Insert a plain washer and a lock washer on each of the
two front connecting rods underneath the air trap and
mount the nuts (C).
Note: The lock washer should be closest to the nut.
Tighten the nuts using a torque of 3 Nm (±0.3 Nm). Verify
also that the other three nuts are tightened, using the
same torque value.
Return the air trap to the support (D), aligning the bottom
part of each connecting rod through the holes in the
support.
Connect the air trap inlet and outlet to the system valves.
2
Sightglass cover assembly instruction
A
C
D
E
F
F
G
B