Download Print this page

Emerson LK70LED Owner's Manual page 7

Ceiling fan led light fixture

Advertisement

BP7502 LK70, 80, 90, 140 LED
3. Installation on Emerson Fans Having a
Modular Switch Cup with Center Screw
3.10
Insert the LED light fixture assembly chain and the fan
speed control switch chain through the hole in the glass
bowl (Figure 9).
Gently place the glass bowl onto the LED light fixture
assembly (Figure 9).
NOTE: It is critical that the fan chain(s) are aligned with
hole(s) in the glass bowl for smooth operation of the fan
switch(es).
3.11
Route the fan speed control chain through the offset
hole of the bowl cap (Figure 10).
Route the LED light fixture assembly chain through the
center hole of the bowl cap (Figure 10).
Place the bowl cap onto the threaded stud and against
the glass bowl.
NOTE: The bowl cap comes with three options: no holes,
one hole and two holes for pull chain options.
Install and tighten the threaded finial nut onto the
threaded stud of the LED light fixture assembly
(Figure 10).
NOTE: The finial nut comes with two options: no holes
and one hole for pull chain options.
NOTE: It is advisable to periodically check the tightness
of the finial nut.
3.12
Connect the wood pendant (supplied) to the switch pull
chain by sliding the wood pendant (small hole first) onto
the pull chain (Figure 11).
Attach the chain coupling to the end of the chain and
allow the wood pendant to fall down over the
coupling (Figure 11).
10/13/15
3:02 AM
Page 7
7
(Continued)
LED LIGHT FIXTURE
ASSEMBLY CHAIN
Figure 9
GLASS
BOWL
THREADED STUD
LED LIGHT FIXTURE
ASSEMBLY CHAIN
Figure 10
LED LIGHT FIXTURE
ASSEMBLY CHAIN
WOOD PENDANT
COUPLING
Figure 11
Please contact 1-800-654-3545 for further assistance
ETL Model No.: LK70LED/LK71LED/LK72LED/LK74LED/LK77LED/
LK80LED/LK81LED/LK83LED/LK90LED/LK91LED/LK140LED/LK141LED
GLASS
BOWL
FAN SPEED
CONTROL CHAIN
FAN SPEED
CONTROL CHAIN
BOWL CAP
FINIAL NUT
GLASS
BOWL
FAN SPEED
CONTROL CHAIN
WOOD PENDANT
COUPLING
emersonfans.com

Advertisement

loading