Page 2
: F.G.Ward Release Date : 1 May 2006 Review Date : 1 May 2009 Name : F. G. Ward BSc; MPhil; CEng; MIAgE Position : GSI Compliance Engineer being the responsible person appointed by the manufacturer. PNEG-1162CEX DMC DIII Stir-Ator...
10. If attending to stuck augers, NEVER attempt to release the auger without isolating the Stir-Ator first. 11. Before restarting the Stir-Ator, ensure that there is no one remaining in the bin and that the bin access door is locked/closed. 12. Remember to replace all guards before restarting. PNEG-1162CEX DMC DIII Stir-Ator...
7. Operating the Stir-Ator during bin unloading can be beneficial to the unloading process as well as prevent auger damage. 8. DO NOT OVER FILL THE GRAIN BIN. BURYING THE STIRRER WILL DAMAGE BIN AND WILL VOID THE DESIGN III WARRANTY. 9. DO NOT OPERATE DESIGN III STIR-ATOR IN AN EMPTY BIN. PNEG-1162CEX DMC DIII Stir-Ator...
PRESENT DURING AND AFTER possession. Check that power to all equipment is “OFF” before entering. OPERATION. MAY IMPAIR VISION Failure to do so may result in a AND BREATHING. fatal accident. 1067023 1067020 PNEG-1162CEX DMC DIII Stir-Ator...
16' (4.9 m) Auger 14' (4.3 m) Grain 94 Kg per Auger 18' (5.5 m) Auger 16' (4.9 m) Grain 109 Kg per Auger 20' (6.1 m) Auger 18' (5.5 m) Grain 136 Kg per Auger PNEG-1162CEX DMC DIII Stir-Ator...
5. Installation GSI RECOMMENDS THAT YOU REFER TO THE GRAIN BIN INSTALLATION/USAGE MANUAL, BEFORE INSTALLING THE STIR-ATOR, TO CHECK FOR ANY ADDITIONAL REQUIREMENTS FOR THE BIN TO CARRY THE STIRRING AUGER SYSTEM. On a new bin installation, we recommend the stirrers be installed as the bin is assembled, allowing much of the work to be carried out at ground level.
(See Figure 5E on Page 11.) 2. Lock the hooks in position using the holes provided. 3. Note, if a safety switch and line is to be installed (NOT SUPPLIED), recommended locations are as shown below. PNEG-1162CEX DMC DIII Stir-Ator...
Page 11
5. Installation Figure 5E Suspension Bar and Chain Locations Figure 5F Typical Safety Switch Installation PNEG-1162CEX DMC DIII Stir-Ator...
Ensure the marking 1-1/2" is uppermost when fitting the frame end. (See Figure 5H.) Figure 5H Fit Outboard Frame Ends 3. Attach the track drive unit. (See Figure 5I.) Carriage bolts Track drive unit Figure 5I Track Drive Unit PNEG-1162CEX DMC DIII Stir-Ator...
Page 13
6. Fit the auger trolley drive post and arm, using the lower hole in the post and two (2) cotter pins (one below, one above the trolley) provided. PNEG-1162CEX DMC DIII Stir-Ator...
Page 14
Figure 5N Fit Inboard (Bin Centre) Frame End 8. Check that the hold-down rods are positioned correctly. There should be approximately 10 mm between the rod and the bottom of the rail. (See Figure 5O on Page 15.) PNEG-1162CEX DMC DIII Stir-Ator...
Page 15
9. The yoke assembly is attached to the frame rails by placing the pivot tube into the center frame support. Secure by placing a cotter pin through the tube. (See Figure 5P and Figure 5Q.) Figure 5P Centre Yoke Assembly Frame inboard end Cotter pin Centre yoke pivot tube Figure 5Q Centre Yoke Pivot PNEG-1162CEX DMC DIII Stir-Ator...
Page 16
Bolt heads must be inside the rails to prevent interference with the trolley. (See Figure 5R and Figure 5S.) Figure 5R End Yoke Figure 5S Fit End Yoke 11. Attach the end yoke to the main tube as shown in Figure Figure 5T Fit End Yoke to Tube PNEG-1162CEX DMC DIII Stir-Ator...
Page 17
Figure 5V Attach Yoke to Steel Angle 13. Attach the slip ring unit to the centre yoke assembly using a 1/2" x 3" bolt, lock nut and roll pin as shown in Figure 5X on Page Figure 5W Slip Ring Unit PNEG-1162CEX DMC DIII Stir-Ator...
Page 18
1/2" x 3" Bolt and lock nut Roll pin Figure 5X Fit Slip Ring Unit 14. Attach the slip ring anchor plate as shown in Figure Anchor plate Bolt Figure 5Y Fix Slip Ring Anchor Plate PNEG-1162CEX DMC DIII Stir-Ator...
Page 19
5AA. Use four (4) 1/4" x 5/8" flange whiz lock screws and nuts. Check the plate is the correct way up, as shown. Mount plate Bolt and nut (4) Figure 5AA Fix Beam Box Mounting Plate PNEG-1162CEX DMC DIII Stir-Ator...
Page 20
Mount plate Figure 5AB Fix Cable Support Arm 18. Attach the beam box to the mounting plate with the cable glands uppermost. Use four (4) 5 mm self-tapping screws. (See Figure 5AC.) Figure 5AC Beam Box PNEG-1162CEX DMC DIII Stir-Ator...
Conductor sizes given are minimum. The installing electrician must calculate the cable size required to suit site conditions and to comply with relevant wiring and electrical regulations and codes. Figure 5AE General Wiring Scheme PNEG-1162CEX DMC DIII Stir-Ator...
Page 22
DAMAGE AS THE TROLLER MOVES UP AND DOWN THE BEAM. 3. CHECK THAT THE LOOP OF CABLE DOES NOT FOUL ON ANY PARTS OF THE STIRRER. 5 Core H07 cable Figure 5AF Cable Route in Centre Yoke PNEG-1162CEX DMC DIII Stir-Ator...
Page 23
4. Use wire ties to tie the cable to the cable arms. 5. Run a cable from the beam box to the auger motors as shown in Figure 5AG. 3 or 4 Core H07 cable Auger motor cable gland Figure 5AI Cable Route to Auger Motor PNEG-1162CEX DMC DIII Stir-Ator...
Page 24
Figure 5AK Track Motor Cable Electrical Connections Make connections in accordance with connection diagrams in Figure 5AL and Figure 5AM on Page NOTE on 1 phase units, two (2) parallel LIVE and two (2) parallel NEUTRAL supplies must be used. PNEG-1162CEX DMC DIII Stir-Ator...
Page 25
Figure 5AL Slip Ring Connections - 3 Phase Units Figure 5AM Beam Box Wiring - 3 Phase Triple Auger Units BEFORE PUTTING INTO SERVICE, THE INSTALLER MUST CHECK THAT ALL CABLE GLANDS AND STRAIN RELIEFS ARE FULLY TIGHTENED. PNEG-1162CEX DMC DIII Stir-Ator...
Page 26
Connect trolley drive arm to cable connector using one 1/2" SAE flat washer and 5/32" x 1" cotter pin. (See Figure 5AO.) BE SURE CABLE CONNECTOR IS AS SHOWN IN PHOTO. If assembled incorrectly, connector will not go around cable pulleys. Figure 5AO Drive Wire Attachment Figure 5AP Correct Connector Alignment PNEG-1162CEX DMC DIII Stir-Ator...
Page 27
11. When the suspension bar is about 450 mm above the eave height, the ends of the suspension chains should be placed through loops and around the tube ends and hooked back on the main strand with the “S” hooks. (See Figure 5AS on Page 28.) PNEG-1162CEX DMC DIII Stir-Ator...
Page 28
Figure 5AT Lift Track Drive onto Rails Figure 5AU Fit Hold-down Pins 14. To prevent the stirrer from moving on the rails we recommend locking it in place with vise grips. (See Figure 5AV on Page 29.) PNEG-1162CEX DMC DIII Stir-Ator...
Page 29
Once the auger is installed into a grain bin, the bin becomes a hazardous environment. No-one must ever be in the bin when the auger is operating. DANGER GSI recommends the installation of safety switches on the personnel door so that whenever the door is opened all equipment stops automatically and cannot WARNING be restarted without the door first being closed and the operator restarting at the main control panel.
Page 30
Remove 75 mm from this height to get the required auger length. 5. Measure the length on the auger rod and cut to length. ONLY CUT FROM THE BOTTOM OF THE AUGER. NEVER FROM THE TOP. PNEG-1162CEX DMC DIII Stir-Ator...
Page 31
10. Place the auger clamp with spring pin over the holes so the spring pin is inserted into the auger. (See Figure 5AY on Page 32.) 11. Evenly torque the clamp bolts to 190 Nm. (See Figure 5AZ on Page 32.) PNEG-1162CEX DMC DIII Stir-Ator...
Page 32
8. Have an assistant pull the auger back the required trail-back distance and then adjust the tilt switch accelerometer so that the test light just comes turns OFF, the voltmeter reads no voltage or the red indicator light is OFF. PNEG-1162CEX DMC DIII Stir-Ator...
Page 33
10. When adjustment is complete, shut the power OFF; remove the test light or voltmeter; reconnect the track motor cable; and re-set the auger motor overloads. Auger Length Auger Trail-Back Distance 6.5 m 1000 mm 5.5 m 870 mm 4.5 m 710 mm Figure 5BA Auger Trail-Back Distance PNEG-1162CEX DMC DIII Stir-Ator...
7. Exit the bin; remove wooden planks; and re-start the auger. TO HELP PREVENT AUGER COMPACTION, WE RECOMMEND THAT DURING THE STORAGE PERIOD THE AUGERS BE STARTED AND RUN FOR 15 MINUTES EVERY WEEK. THIS WILL KEEP THE AUGERS POLISHED AND HELP PREVENT COMPACTION. PNEG-1162CEX DMC DIII Stir-Ator...
14 months from arrival at port of discharge, whichever is earlier. The end-user’s sole remedy (and GSI’s only obligation) is to repair or replace, at GSI’s option and expense, products that in GSI’s judgment, contain a material defect in materials or workmanship.
Need help?
Do you have a question about the DMC DIII Stir-Ator and is the answer not in the manual?