Notes Concerning Multi-Channel
and Addressable Nodes
On Multi-channel Nodes, sensor cables should be inserted into
the cable glands in order from left to right and wired in
sequence, starting with Channel 1
Wire sensors into the "VW" terminal blocks only
(Not the blocks marked "485_IN" and "485_OUT"
Multi-channel and addressable Nodes stop trying to read empty
channels after two attempts; additional attempts occur at the
top of every hour (Reset the Node to initiate an immediate retry)