Download Print this page

Geokon GeoNet 8900 Series Installing page 23

Wireless data hosting systems
Hide thumbs Also See for GeoNet 8900 Series:

Advertisement

Power the Node (Continued)
The green LED on the Node will
3.
flash twice (may take several
seconds to occur)
The Node will join the network in
4.
approximately 30 seconds
(May take longer if Supervisor is
not in Deployment mode)
The LEDs on the Supervisor and
5.
Node will begin flashing in
unison
Verify that the LEDs on the Node
6.
and the Supervisor are flashing
green only
before continuing

Advertisement

loading