Download Print this page

Geokon GeoNet 8900 Series Installing page 22

Wireless data hosting systems
Hide thumbs Also See for GeoNet 8900 Series:

Advertisement

Power a Node
Nodes should be powered up
in close proximity to the
Supervisor
Align the positive (+) side of
1.
the D cell batteries with the
left side of the battery holder
Push the batteries straight
2.
down into the holder
Move the battery selector
3.
switch to "ALKALINE" or
"LITHIUM" depending on the
type of batteries installed

Advertisement

loading