Download Print this page

Geokon GeoNet 8900 Series Installing page 17

Wireless data hosting systems
Hide thumbs Also See for GeoNet 8900 Series:

Advertisement

Powering a Supervisor without
Cellular Capability
Align the positive (+) side of
1.
the D cell batteries with the
left side of the battery holder
Push the batteries straight
2.
down into the holder
Move the battery selector
3.
switch to "ALKALINE" or
"LITHIUM" depending on the
type of batteries installed

Advertisement

loading