Mounting and installation instructions,
Air outlet through
Dependent on the design of the plant room, it is possible to blow the dry air out
the top
through the top of the unit. In that case the fan must to be moved from the end to the
top. It is done as follows:
Changing the
The inspection side of the unit can be changed to the opposite side. It is done as fol-
inspection side
lows:
Duct connection
The inlet and outlet ducts and any inlet and outlet grilles, must be dimensioned such
that external pressure losses never exceed the values mentioned in the table below.
If pressure losses are higher there is a danger of the unit cutting out via the high-pres-
sure pressostat due to too little air passing over the condenser.
Step
1
Remove the fan cable and loosen it from the terminals 7/8 in the control
panel
2
Remove the cover panel with the fan fixed to it
3
Remove the top cover panel
4
Refit the cover panel with the fan to the top of the unit
5
Refit the top cover panel to the front of the unit
6
Connect the fan cable to the terminal 7 / 8 in the control panel
Step
1
Remove the rear cover panel
2
Remove the inspection door and the cover panel on front of the unit
3
Remove the middle control panel section and move it through the unit to the
rear side
4
Remount the inspection door and the cover panel on the rear of the unit
5
Remount the cover panels on front of the unit
Pa
continued
Action
Action
CDP 75 MK II
CDP 125 MK II
140
CDP 165
230
240
Continued overleaf
31