DWG. NOTES
1) INSERT SOCKET OF LIGHT ASSY THRU TOP KEY
WHILE INSTALLING LIGHT. TIGHTEN SCREWS.
2) APPLY GREASE TO PIN PRIOR TO INSTALLING ROLLER.
3) HARNESS TO BE TUCKED INSIDE CHANNEL
9
1
24442
BEARING-FLANGE-1/2" X 1/4"-08FDU04
8
2
32949
WELD NUT-#4-40 X 1/8" BARREL-ZINC
7
2
11481
SCREW-#4-40 X 3/8" RD. HD.
6
1
33689A
HARN-BRIDGE-NL/NCL-2
5
1
32408
RUBBER BUMPER-VERT CHAN.
4
1
84383
E CLIP-3/8 SHAFT
3
1
32734
ROLLER-LIFT TITE
2
1
31062A
ASSY-LIGHT-VERT. CHANNEL/PHILIPS SOCKET
1
1
949-2448RNW
WMT-VERTICAL CHANNEL-REAR-48"
ITEM
QTY.
PART NO.
DWG. NOTES
1) INSERT SOCKET OF LIGHT ASSY THRU TOP KEY
WHILE INSTALLING LIGHT. TIGHTEN SCREWS.
2) APPLY GREASE TO PIN PRIOR TO INSTALLING ROLLER.
6
1
24442
BEARING-FLANGE-1/2" X 1/4"-08FDU04
5
1
32408
RUBBER BUMPER-VERT CHAN.
4
1
84383
E CLIP-3/8 SHAFT
3
1
32734
ROLLER-LIFT TITE
2
1
31062A
ASSY-LIGHT-VERT. CHANNEL/PHILIPS SOCKET
1
1
949-2448FNW
WMT-VERTICAL CHANNEL-FRONT-48"
ITEM
QTY.
PART NO.
Exploded Views and Parts Lists
Vertical Arm Assembly - Rear
7
9
DESCRIPTION
Vertical Arm Assembly - Front
DESCRIPTION
6
DETAIL A
(SCALE = 1/2)
NOTE: 3
NOTE: 2
3
4
(SCALE = 1/8)
2
5
6
NOTE: 1
2
8
5
1
9
NOTE: 1
1
NOTE: 2
3
4
Page 27