DWG. NOTES
1) INSERT SOCKET OF LIGHT ASSY THRU TOP KEY
WHILE INSTALLING LIGHT. TIGHTEN SCREWS.
2) APPLY GREASE TO PIN PRIOR TO INSTALLING ROLLER.
3) HARNESS TO BE TUCKED INSIDE CHANNEL.
4) BUSHING NOT SHOWN.
8
2
32949
WELD NUT-#4-40 X 1/8" BARREL-ZINC
7
2
11481
SCREW-#4-40 X 3/8" RD. HD.
6
1
32855A
HARN-BRIDGE-NL/NCL-2
5
1
32408
RUBBER BUMPER-VERT CHAN.
4
1
84383
E CLIP-3/8 SHAFT
3
1
32734
ROLLER-LIFT TITE
2
1
31062A
ASSY-LIGHT-VERT. CHANNEL/PHILIPS SOCKET
1
1
945-0448RNW
WMT-VERTICAL CHANNEL-REAR-48"
ITEM
QTY.
PART NO.
DWG. NOTES
1) INSERT SOCKET OF LIGHT ASSY THRU TOP KEY
WHILE INSTALLING LIGHT. TIGHTEN SCREWS.
2) APPLY GREASE TO PIN PRIOR TO INSTALLING ROLLER.
5
1
32408
RUBBER BUMPER-VERT CHAN.
4
1
84383
E CLIP-3/8 SHAFT
3
1
32734
ROLLER-LIFT TITE
2
1
31062A
ASSY-LIGHT-VERT. CHANNEL/PHILIPS SOCKET
1
1
945-0448FNW
WMT-VERTICAL CHANNEL-FRONT-48"
ITEM
QTY.
PART NO.
Exploded Views and Parts Lists
Vertical Arm Assembly - Rear
8
"A"
DESCRIPTION
Vertical Arm Assembly - Front
2
DESCRIPTION
NOTE:
3
6
7
C
2
NOTE:
4
DETAIL A
(SCALE = 2X)
NOTE:
2
3
4
NOTE:
1
5
1
NOTE:
2
3
4
NOTE:
1
2
5
1
Page 27