6. Commissioning

The tasks described in this section may only be
carried out by a qualified electrician.
6.1

Checking the device

Test according to IEC 60364-6 and the applicable nation-
al regulations (e.g. in Germany: DIN VDE 0100-600)
Prior to the initial setting-up process, carry out an inspec-
tion of the device in accordance with IEC 60364-6 and
the applicable national regulations (e.g. in Germany: DIN
VDE 0100-600). The test can be carried out in connection
with the MENNEKES test box and a standard-compliant
test equipment. The MENNEKES test box simulates vehicle
communication. Test boxes are available as accessories
from MENNEKES.
f Perform a standard test before the device release.
Operating instructions of the test box.


6.2 Switching on the device

T
T
DANGER
Electric shock hazard when devices are damaged
When using a damaged device, there is a risk of electric
shock.
f Do not use the device if it is damaged.
f Mark the damaged device to ensure that no one contin-
ues using it.
f Eliminate damage immediately.
f Take the device out of service if necessary.
Precondition:
„ Device is installed correctly.
„ Device is in a proper condition.
„ All protective devices (e.g. residual current device,
miniature circuit breaker, contactors) are functional and
switched on.
„ During the initial setting-up process, the device was
inspected in accordance with IEC 60364-6 and the
applicable national regulations (e.g. in Germany: DIN
VDE 0100-600).
12
f Switch on the power supply and check.
Î "6.3 Monitoring the power supply"
9
LED on the power supply unit is on.

6.3 Monitoring the power supply

The phase sequence relay monitors the three phases (L1,
L2, L3) and the neutral conductor (N) of the power supply
for correct phase sequence, phase failure or undervoltage.
Fig. 12: Monitoring the power supply
The operating status is indicated by three LEDs:
Item
All LEDs light up. All three phases are present,
A
clockwise rotating field is applied.
9
The device is ready for use.
Phase failure / power failure. The corresponding
LED is off.
B
9
The device is not ready for use.
Anti-clockwise rotating field. A flashing LED "wan-
C
ders" from L3 to L1.
The device is not ready for use.
9
Undervoltage between two phases or between
phase and neutral conductor.
L - L = < 295 V
D
L - N = < 170 V
The corresponding LED flashes.
9
The device is not ready for use.
Description