Download Print this page

Keysight N5225-60142 Manual page 35

2-port pna direct digital synthesizer for version 7 synthesizers - upgrade kit

Advertisement

Description of this Upgrade
Step 17. Prepare the PNA for the User
Figure 17
EEPROM Backup Menu
Operator's Check
Perform the Operator's Check to check the basic functionality of the analyzer.
For instructions, refer to the "Tests & Adjustments" chapter of the Service
Guide.
If you experience difficulty with the basic functioning of the analyzer, contact
Keysight. Refer to
Calibration
Although the analyzer functions, its performance relative to its specifications
has not been verified. It is recommended that a full instrument calibration be
performed using the N7840A performance test software or the instrument's
embedded performance tests. Refer to the analyzer's service guide for
information on the performance test software.
Step 17. Prepare the PNA for the User
1. If necessary, reinstall front jumper cables.
2. Install the cable guards, pushing them over the front jumper cables until
3. Install the dust caps on the test ports.
4. If necessary, install labels included in kit as required (e.g., KCC and two
5. Clean the analyzer, as needed, using a damp cloth.
Installation Note N5225-90142
"Getting Assistance from Keysight" on page
the cushioning material touches the front panel of the PNA.
person Caution).
4.
35

Advertisement

loading