S A F E G E A R ® M O T O R C O N T R O L C E N T E R /A R C - R E S I S TA N T M E TA L - C L A D C O N S T R U C T I O N
41
01 Refer to the
interconnect diagram
provided to you by the
project engineer to find
the shipping splits and
exact frames where
rewiring is necessary.
Locate the wires to be
interconnected. (Refer
to the interconnect
diagram to find the
frame housing the wires
to be interconnected).
02 Transfer all the wires
to be interconnected
from one frame to the
next frame through the
opening provided in
the LV compartment.
Opening
provided
in the LV
compartment.