I N S TA L L AT I O N , O P E R AT I O N A N D M A I N T E N A N C E M A N U A L
7.
Procedure
01 Put the two frames
to be assembled in
place next to each other.
Make sure all doors and
panels are secured while
moving the frames. Use
the pry, bar if required,
for alignment.
The line-up you received
might include more than
one frame on either side,
the rest of the frames are
assembled together in
the plant and excluded
from the pictures in this
manual for simplicity.
02 Open the LV
compartment door and
the controller door in
the left frame. Look
inside the left frame on
the right and notice the
Tinnerman nuts installed
(highlighted in green).
01
View front (right frame)
02
Tinnerman
Nuts
Bolts
Tinnerman
Nuts
28