Figure 9-3: Example Set-for-Flight voltage and current profiles at NTP
Table 9-1: Set-for-Flight electrical verification (values apply only at NTP)
Item
1
2
Free-running current (average)
3
4
Time to initially cut power
1) It is acceptable for one motor to exceed the maximum allowed time to initially cut power.
2) Use the current channels to determine time.
PSC Proprietary
Set-for-flight Electrical Parameters
Description
First peak current
Post free-run current rise
2000781J MkII MLB Operating Procedure
Allowable
Units
Min
A/mtr
1.05
A/mtr
0.02
0.18
A/mtr
0.2
s
1.0
1,2
Measured
Max
Motor A
Motor B
1.7
1.7
1.3
Page 32 of 50