Revision History - PSC 2000781J MkII MLB Operating Procedure

Table of Contents

Advertisement

1. Revision History

Rev
Issued
Created Reviewed Change Description
-
02Nov06
RW
A
11May07
to
to
Varies
H
16Jun16
I
-
-
J
17Jan19
RH
PSC Proprietary
RW
Initial document
Varies
See prior revisions for details.
-
This revision not used as I may be confused for 1 in document number.
1) General wording and formatting improvements throughout document.
2) Cover page: Updated.
3) Changed all references of STP to NTP.
4) Section 2: Added and updated acronyms.
5) Section 3: Added reference to training record and website check for
latest revision. Reworded Lightband operation descriptions.
6) Figure 3-1, Figure 3-2, Figure 3-5, Figure 3-6: Updated.
7) Section 3.2: Added equipment and organized by section.
8) Section 4: Added #10
9) Section 6: Added Lower Ring # 5.
10) Figure 6-4: Added.
11) Section 7: Removed training verification step. Added Lightband
circularity note.
12) Step 7.1.4: Added cleaning of Lightband surfaces also.
13) Section 8.1: Reordered several steps.
14) Step 8.1.6: Increased allowable lateral stiffness.
15) Step 8.1.7: Removed pre-mate alignment requirements. Changed to
visibly level.
16) Step 8.1.10: Removed LCT reference.
17) Figure 8-5: Updated.
18) Step 8.2.3: Added detailed resistance measurement examples.
19) Figure 8-6, Figure 8-7: Updated power source symbol.
20) Step 8.2.8: Added.
21) Step 8.2.14: Removed picture as allowable data record.
CF
22) Table 8-1: Reduced MLB13 minimum allowable 2
Reduced MLB31 & MLB38 minimum allowable startup current. Added
note to use current for durations.
23) Step 9.1.3: Added detailed resistance measurement examples.
24) Figure 9-1, Figure 9-2: Updated power source symbol.
25) Step 9.1.8: Added.
26) Step 9.1.13: Removed picture as allowable data record.
27) Figure 9-3: Refined notes.
28) Table 9-1: Added note to use current for durations.
29) Step 10.1.3: Added detailed resistance measurement examples.
30) Figure 10-1, Figure 10-2: Updated power source symbol.
31) Step 10.1.8: Added.
32) Step 10.1.5: Removed picture as allowable data record.
33) Table 10-1: Reduced maximum allowable first peak current. Added
note to use current for durations.
34) Section 12: Changed entire section from an electrical operation to a
manual operation.
35) Section 15: Documents now available on website.
36) Table 15-1: Removed #10 shoulder washer and LCTs. Added
alignment screws. Updated figures.
37) Figure 17-1: Updated power source symbol.
38) Section 18: Added. 2002159E LCT Procedure subsumed into this doc
and simplified. Deleted max allowable LCTs. Allowable LCT mounting
torque increased.
2000781J MkII MLB Operating Procedure
peak current.
nd
Page 3 of 50