Able 2-5B General Maintenance And Inspection Schedule - As - Skyjack SJIII Series Maintenance & Parts Manual

Hide thumbs Also See for SJIII Series:
Table of Contents

Advertisement

Before attempting any repair work, disconnect the battery by turning the main power disconnect switch
to off position. Preventive maintenance is the easiest and least expensive type of maintenance.
able 2.5b Maintenance and Inspection Schedule - AS
requency
Visual and
aily Maintenance Inspections
Labels
Electrical
Limit Switches
Hydraulic
Entrance Side
Main Power Disconnect Switch
Base Control Switches
Free-wheeling Value Knob
Brakes
C Outlet Receptacle
Ladder
Battery Tray Side
Pothole Protection Device
Battery Tray
Battery Charger
Battery
Steer Cylinder ssembly
Wheel/Tire ssembly
Tie Rod (Conventionals)
Greasing Points
Hydraulic/Electric Tray Side
Pothole Protection Device
Hydraulic Tank
Hydraulic Oil
Hydraulic Pump and Motor
Electrical Panel
Proportional and Main Manifolds
Tilt Sensor
Emergency Lowering ccess Rod (If Equipped)
Platform Assembly
Lanyard ttachment nchors
C Outlet on Platform
Platform Control Console
Manual
Powered Extension Control Console (If Equipped)
A - Perform Visual and Daily Maintenance Inspections & Functions Test. Refer to
B - Perform Scheduled Maintenance Inspection. Refer to Service & Maintenance manual.
* - Maintenance must be performed only by trained and competent personnel who are familiar with mechanical procedures.
Use original or equivalent to the original parts and components for the aerial platform.
JIII eries
General Maintenance
3 months or
aily
Yearly
150 hours
Lifting Mechanism
Maintenance Support
Scissor ssembly
Scissor Bumpers
Rollers
Lift Cylinder(s)
Function Tests
Test Main Power isconnect Switch
Base Control Console
Test Base Emergency Stop
Test Enable Button (If Equipped)
Test Platform Raise/Lower Switch
Test Emergency Lowering
Test Free-wheeling
Platform Control Console
Test Platform Emergency Stop
Test Enable Trigger Switch
Test Steering
B*
Test Driving
Test Brakes
Test Platform Raising/Lowering
Test Lowering Warning
Test Horn
Test Pothole Sensor
Test Speed Limit
Test Tilt Sensor
Section 2.8
and
Section 2.9
WARNING
Section 2 - List of ables
requency
of th op rating manual.
3 months or
aily
Yearly
150 hours
B*
B*
60598
- S
KYJACK, Page

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

32153219

Table of Contents